My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-1999 Council Packet
Orono
>
City Council
>
1999
>
06-28-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 3:42:34 PM
Creation date
4/12/2023 3:37:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO CITY COUNCIL MEETING <br />MINUTES FOR JUNE 14,1999 <br />MAYOR/COUNCIL REPORT- Continued <br />Jabbour said he does not want to act on this request until the outcome of Townline Road is <br />known. He asked that a letter be sent to Medina informing them that the City will not be able <br />to make a determination about the availability of additional sewer units until the plans for the <br />replacement of the current sewer trunk line as part of the Highway 12 upgrade project are <br />completed. <br />ENGINEER REPORT <br />(#13) SCHEDULE PUBLIC HEARING FOR FOX RIDGE SANITARY SEWER <br />PROJECT <br />A. ORDER PREPARATION OF REPORT FOR FOX RIDGE SEWER - <br />RESOLUTION NO. 4306 <br />Kelley asked if the sewer will be located underneath the bridge at the Luce Line. <br />Gappa said it will go underground under the Luce Line with directional boring. <br />Kellogg said it is a small diameter pipe. <br />Kelley said staff should not be shortsighted and put in too small a pipe. He said staff should <br />considot whether the pipe should be run all the way down Brown Road in the future. <br />Kelley asked about the Webber Hills project. <br />Kellogg said the Webber Hills project will be independent of the Fox Ridge project. <br />Kelley said he just wants to make sure the right size pipes are used in the right spots to allow <br />f or future expansion. <br />Jabbour said it would be helpful for staff to present a grid showing how areas will be sewered <br />and also showing a 25 or SO year grid showing the size of the pipe. He said that the Long <br />Lake and Orono sewer systems should be looked at to see if they could be integrated. <br />Moorse said staff has been working with Long Lake*s consultant engineer to put together a <br />scope of services to see if there are some efficiencies that can be put in place. <br />Kelley moved, Peterson seconded, a motion approving Resolution No. 4306 Ordering <br />Preparation of a Feasibility Report for the Installation of Municipal Sanitary Sewer to <br />Serve the Fox Ridge Area. VOTE: Ayes 5, Nays 0. <br />B. RECEIVE REPORT AND SCHEDULE HEARING FOR FOX RIDGE SEWER, <br />RESOLUTION NO. 4307 <br />Page 23
The URL can be used to link to this page
Your browser does not support the video tag.