My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-1999 Council Packet
Orono
>
City Council
>
1999
>
06-28-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 3:42:34 PM
Creation date
4/12/2023 3:37:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I • • <br />WEBBER HILLS SANITARY SEWER QUESTIONS AND CONCERNS Page 3 of 3 <br />June 28, 1999 <br />Provide a detailed feasibility study with routing drawings and details for the grinder pump <br />systems to be provided at each home. <br />Provide drawings of required construction from individual homes to the main line at the <br />street so that homeowners can get accurate costs for individual hookup to the City system. <br />Can existing septic tanks be used for the grinder pump system required at each home. This <br />would reduce the cost to homeowners. <br />Obtain an accurate cost for con*-truction of the Low Flow system and provide this to all <br />homeowners. Due to the significant increases in estimated costs in the past, the residents <br />do not have a great deal of comfort with the current engineering firms cost estimates.
The URL can be used to link to this page
Your browser does not support the video tag.