Laserfiche WebLink
ORONO CITY COUNCIL MEETING <br />MINUTES FOR MAY 10,1999 <br />(#3 James'i^nckeDS, continued) <br />Jabbour said he abstain if the matter is re-opened. <br />. Flint explained his opihiDn that access to the property should b^om Crystal Creek Roid. • <br />Kelley said there should norhe any discussion on this^ <br />the neighbors have not been notified. <br />(tter if it will be re-opened because <br />Flint moved, Kelley seconded, a lotion t^i4-open #2466 for James Renckens and John <br />Winston, 3020 Watertown Road - Pi'elimmaiy Plat Application and table the matter for <br />itti/ tffWA^a <br />Jabbour asked if the applicants^^d object WvAe matter being tabled for two weeks. <br />Winston said they have iMfwth staff and they areV^g to continue to work with staff. <br />They are willing to po^^one it for two weeks and works^vith staff in the interim. They would <br />like to have it re-opeiied. <br />Sansevere said^t^t Renckens told him that at the April 12th m^t|^, the Council received <br />misinform^m and there were some inaccurate comments made tMts^ight that might have <br />affected^e way the Council members voted. <br />voir?* Ay« 3, Nays 0. (Jabbour and Peteraon^lj&tamejL)------------------------------- <br />(#4) #2477 GEORGE W. STICKNEY, 250 AND 340 OLD CRYSTAL BAY ROAD - <br />PRELIMINARY PLAT <br />George Stickney, applicant, and Mark Gronberg were present. <br />Weinberger presented the staff report. He said the applicant has proposed an ei^t lot <br />subdivision on the east side of Crystal Bay Road just north of the Luce Line Trail. The <br />property is located in the RR-IB, single family residential district, two-acre minimum lot size. <br />He said staff was presented a new plan today regarding the NURP pond in relation to the <br />wedand delineadon report The NURP pond was to be located on Lot 5. It is proposed to be <br />moved to Lot 2. Staff is concerned that a NURP pond in that area will not handle the <br />drainage from the entire site which is the intent of the NURP pond. Since staff just received <br />the proposal, there has not been time for the City Engineer to review the plan and drainage <br />calculadons have not been delivered to the City. Weinberger said that Ae City Engineer <br />should have an opportunity to review the plan, especially since it will involve proposed <br />culverts and other ways of piping the water into the wedand. Weinberger said there is also an <br />issue regarding whether the entire wetland area should be considered against lot area because <br />the Type 1 and 2 wedands are an extension of the Orono wedands. Weinberger said that the <br />Page 4