Laserfiche WebLink
: A. , i 1 <br />All iT 'nestroo <br />Rosene <br />Anderlik & <br />Associates <br />Engln«eritArcWttcu Bid Opening; 3/24/99 11^00Mt <br />Vi*-; <br />\ <br />'jas^ <br />1 <br />Project Name: Ed9ewood Hills Sanitary Sewer <br />Project No.;File No. <br />Owner. <br />/ hereby certify that this is an exact <br />G/er:r7 R Ccck, P.E, <br />Registration No. 9451 <br />Item <br />Num Item Units <br />27 <br />28 <br />29 <br />Bid No. 1 <br />G L Contracting Inc <br />Unit Price <br />Alternate Bid (Plan Sheets 1. 2,3A, and 4) <br />Part 1 - Sanitary Sewer <br />Construct manhole over existing <br />sewer <br />Air release MH <br />Force main access manhole <br />Cleanout manhole <br />Total <br />1 <br />Part 1 • Sanitary Sewer <br />Constnjct manhole over existing EA 1.CC S30.240.70 S30.240.70 <br />2 <br />sewer <br />Std. MH 8 ‘ dp.. 4* dia., w/R1642B EA 3.00 SI,837.40 $5,512.20 <br />3 <br />cstg. <br />h*H depth greater than 8* dee?LF S131.40 S3,310.£j <br />4 Directional bore 8 “ HOPE SDR 17 LF 790.00 S74.70 559.013.00 <br />5 Directional bore 4** HDPE SDR 11 LF 1300 00 $48 20 562 660 on <br />6 <br />service pipe <br />4” PVC cleanout EA 1000 $684.60 56.846.00 <br />7 8" X 4" PVC or HDPE compatible EA 7.00 $482.90 53.330.33 <br />8 <br />v/ye branch <br />Furnish 8 ‘* x 4'* PVC wye, cut int9 EA 2.00 $1,295.80 52.591.60 <br />9 <br />ex. 8 * PVC <br />4“ PVC service pipe In place, SDR LF 20.00 $16.70 5334.00 <br />10 Insulation SY 20.00 $9.60 SI 92.00 <br />11 Sanitary sewer television inspection LF 790.00 $1.60 $1,264.00 <br />12 Traffic control LS 1.00 $5,296.20 $5,296.20 <br />13 <br />Total Part 1 • Sanitary Sewer <br />Pa»i2-R««to»’atlon <br />Type 41A bituminous wearing course TN 220.00 $44.10 <br />$181,140.60 <br />$9,702.00 <br />14 Bituminous material for tack coat GAL 150.00 $3.30 $495.00 <br />15 Bituminous street patching SY * ••450.00 $30.00 513.500.00 <br />16 Clear and Grub LS 1.00 $5,264.50 55.264.50 <br />17 Bituminous driveway restoration SY 600.00 $21.60 513,080.00 <br />18 Sod with 4** topsoil SY 5000.00 $3.60 $18,000.00 <br />19 Seed >with topsoil, mulch and fertilizer AC 0.50 $2,617.50 <br />20 Erosion control fence LF 500.00 $1.80 $900.00 <br />21 Furnish and plant Evergreen Tree EA 4.00 $484.50 $1,938.00 <br />22 <br />(Blue Spruce) 6 ‘ high <br />Furnish and plant shade tree (Sugar EA 4.00 $127.60 $510.40 <br />23 <br />Maple) 4’* diameter <br />Remove and transplant bushes EA 4.00 $484.50 $1,938.00 <br />24 Remove and transplant tree -EA 4.00 $484.50 $1,938.00 <br />25 <br />Desiduous <br />Remove and transplant tree •EA 4.00 $484.50 $1,938.00 <br />Coniferous <br />Total Part 2 - Restoration <br />Total Part 1 - Sanitary Sewer <br />Total Part 2 • Restoration <br />Total Base Bid • (Plan Sheets 1. 2,3, and 4) <br />$71,821.40 <br />$181,140.60 <br />$71,821.40 <br />$252,962.00 <br />13999bt <br />EA 1.00 530.240.70 $30,240.70 <br />EA 1.00 52.524.50 52.524.50 <br />EA 1.00 52.799.30 52.799.30 <br />EA 1.00 52.299.40 $2,299.40 <br />BT-1 <br />133-98-099 <br />City of Orono