Laserfiche WebLink
mm <br />Bonestroo <br />Rosene <br />Anderlik & <br />Associates <br />Bonestroo. Rosene. Anderlik and Assoc axes. Inc. Is an Affirmative Action/Squa! Opportunity Employer <br />Principals Otto G. Bon<:icroo. PE. ^ Joseph C. Anderlik. PE. • Marvin L. Sorvata. PE • <br />Cler.n R. Cook. PE • Robci: G, Scf jnicht. PE. • Jerry A. Bourdon. PE. • <br />Robert W. Rosene. PE.. Richard E Turner. PE. and Susan M. Eberlin. C.PA.. Senior Consultants <br />Associate Principals: Howard A. Sanford. PE. • Keith A. Gordon. PE. • Robert R. Pfcfferie. PE. • <br />Richard W. Foster. PE. • David O. Loskota. PE. • Robert C. Russek. A.I.A. • Mark A. Hanson. PE. • <br />Michael T. Rautmann. PE. • Ted K.Fiefd. PE. • Kenneth P. Anderson. PE • Mark R. Rolfs. PE. • <br />Sidney P Williamsoa PE-. LS. • Robert F. Kotsmith • Agnes M. Ring • Allan Rick Schmidt PH. <br />Offices Sr Paul. Rochester. Wilimar and St. Cloud. MN • Milwaukee. wi <br />Engineers & Architects Website: wwwbonestroo.com <br />May?. 1999 <br />Honorable City Council <br />City of Orono <br />2750 KeUy Pkwy <br />PO Box 66 <br />Crystal Bay, MN 55323 <br />Re: City of Orono <br />Edgewood Hills Sanitary Sewer Improvements <br />BRA File No. 139-98-099 <br />Honorable City Council: <br />Bids were opened for the project stated above on March 24,1999. Transmitted herewith is a copy of the <br />bid tabulation for your information and file. A copy will also be dishibuted to the bidder. <br />There was a total of 1 bid. The following summarizes the results of the 1 bid received. <br />Contractor <br />Low G L Contracting, Inc. <br />Baxe Bid Amount Alternate Bid Amount <br />$252,962.00 $161,987.80 <br />The low bidder on the project was G L Contracting, Inc. with a base bid amount of $252,962.00. The base <br />bid included work to install a ^avity sewer system in front of the homes in Edgewood Hills Road. The <br />alternate bid was for the installation of a pressure sewer system to serve the neighborhood. The base bid <br />exceeded our engineers estimate of $170,000 by nearly 50%. A meefing with the residents indicated that <br />they were not in favor of a pressure sewer system. The residents want gravity sewer but the base bid <br />resulted in an excessive assessment per unit. As a result, we have worked with the contractor and the <br />residents to come up with a value engineered design to provide gravity sewer to all residents. The <br />resultant design is an alignment located behind the homes away from the roadway. The total construction <br />cost for this value engineered design is $158,620.10, a savings of $94,341.90 from the base bid. <br />The bid has been reviewed and found in order. Therefore, we recommend that the project be awarded to <br />G L Contracting, Inc for the base bid amount of $252,962.00 and that a change order be approved for <br />a total nei deduct of $94,341.90. ^ / b l-Ot \6) <br />Should you have any questions, please feel free to contart me at (651) 604-4863. <br />Yours very truly. <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br />Tom Kell6gg <br />Enclosures <br />TPK:jms <br />cliefitbldubltr <br />I. <br />2335 West Highway 36 ■ St. Paul, MN 55113 ■ 651*636-4600 ■ Fax; 651-636-1311