My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-10-1999 Council Packet
Orono
>
City Council
>
1999
>
05-10-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 3:34:20 PM
Creation date
4/12/2023 3:27:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. <br />7. <br />No building permits will be issued until the private road is completed and all <br />stormwater management improvements have been completed by the developer and <br />approved by the City. <br />The developer shall grant to the City an underlying Road and Utilities Easement for <br />Outlot A. <br />8. The developer shall grant Drainage and utility easements 5 feet along all interior lot <br />lines and 10 feet wide along the right-of-ways. <br />9. The bam and storage building located on Lot 2 shall be removed. <br />10. The existing buildings located on Lot 7 shall be removed. <br />11. Subflivider shall plant boulevard trees along the private road per the requirements of <br />Section 11.60, Subdivision 2. <br />12. Subdivider shall construct stormwater management improvemei.ts to be shown on <br />the Grading, Drainage and Erosion Control Plan to be submitted with the final plat <br />application. A final Grading, Drainage and Erosion Control Plan must be approved <br />by the City Engineer prior to final plat approval. Subdivider shall grant drainage <br />easements over all drainageways and stormwater ponds with the plat. <br />13. Subdivider is hereby advised that the City will not grant final plat approval until the <br />MCWD has approved all grading and drainage improvements on the property. <br />14. All identified primary and alternate sewage system drainfield sites within the <br />subdivision shall be fenced prior to any land alterations, and such fencing shall <br />remain inplace until such time that each Lot is developed. <br />15. Subdivider shall develop covenants for each lot for protection of drainfield sites <br />within each Lot. Covenants shall include protection for alternate septic sites along <br />with site plans locating both primary and alternative sites. The covenant shall alert <br />future property owners of the need to protect identified sites. <br />Page 5 of 8
The URL can be used to link to this page
Your browser does not support the video tag.