My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-10-1999 Council Packet
Orono
>
City Council
>
1999
>
05-10-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 3:34:20 PM
Creation date
4/12/2023 3:27:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
sewer stub at the property line. Restoration of driveways and boulevards would be completed as <br />previously described for the gravity sewer system. <br />The installation of the pressure sewer system would be less intrusive than the gravity system. The <br />common forcemain would not be as deep as the gravity system and would therefore minimize street <br />reconstruction costs. Residential access could b- maintained on all roads during construction. The <br />overall project costs would be substantially Ic ver if the pressure system is installed. The City has <br />indicated that a majority of Webber Hills re.^ .dents favor the pressure sewer system over the gravity <br />sewer system. <br />The project will be constructed on pubb ; and private property. The alignments selected and shown <br />on Figure 2 will require permanent Jid temporai7 easements to allow for construction. The <br />alignments shown on Figure 3 would require temporary construction easements. <br />Detailed cost estimates for both of the sanitary sewer improvement options are presented in the <br />Appendices. <br />Webber Hills Sanitary Sewer Improvements
The URL can be used to link to this page
Your browser does not support the video tag.