Laserfiche WebLink
March 24, 1999 <br />ANDERSON-JOHNSON <br />ASSOCIATES, J <br />INC. <br />Landscape Archiuctur* • Site Planning • Civil Engineering <br />Mr. George Gorbatenko <br />Wold Associates, Inc. <br />305 St. Peter Street <br />St. Paul, MN 55102 <br />RE: Proposed New Orono Middle Scnool <br />Reconstruction of Orono High School <br />Orono, Minnesota <br />Dear George: <br />As a response to condition item ^2 stated in the City of Orono’s Notice of Planning Commission Action <br />(dated March 16, 1999), we offer the following comments: <br />We have reviewed Wallace Case's letter dated, March 14, 1999. Our responses noted below correspond <br />to Mr. Case's paragraphs. <br />I Parking Lot Issues - <br />Pedestrian traffic across islands will be directed over pavement. Also at these crossings, handicap <br />ramps/access will be provided. <br />Currently the 5% gradient in the parking lots and drives meets AD.A requirements. Of course, if <br />these gradients can be decreased that would be our intent, f’owever due to the character of the site this <br />lu.xurv mav not be obtainable. <br />Landscaping will be provided around the High Sc!iool and Middle School bus/event parking areas as <br />budget permits. <br />Lighting - This issue is currently under review by Wold Architects. <br />a Wetlands Creation - Plans and specifications are currently being reviewed by the .Minnehaha Creek <br />Watershed District and, at present, preliminary' findings are generally positive. <br />.Athletic Field Orientation - Due to school’s antic, lated coaching / supervision needs and to allow <br />fle.xibility of the designed fields, the softball fields have been oriented as shown. Furthermore, the <br />orientation of the soccer fields, although not preferred, allows for the largest length and width of the <br />field (if fields were rotated north-south, the fields would fall below regulation size). At present <br />benches, bleachers and permanent goals are not included in the project but may be installed in the <br />future. <br />5.Landscaping - Mr. Case’s comments and suggestions w ill be taken into account when developing the <br />final landscape plan for each of the project sites. As previously indicated, the amount of landscaping <br />shown on the plans was provided in order to meet anticipated City guidelines. With the final design of <br />the -'•unpus landscape master plan, we will strive to link the two schools with a distinct theme and a <br />varied palette of plant material. Tree relocation issues will be further defined as we come closer to <br />bidding the project. <br />VALLEY SQUARE OFFICE CENTER • SUITE 200 • 7575 GOLDEN VALLEY ROAD • MINNEAPOLIS. MN 55427 <br />PH (612) 544-7129 • FAX (612) 544-0531