Laserfiche WebLink
• t <br />March 24, 1999 <br />ANDERSON-JOHNSON <br />ASSOCIATES, A <br />INC. s <br />Landscape Architecture • Site Planning • Civil Engineering <br />Mr. George Gorbatenko <br />Wold Associates, Inc. <br />305 St. Peter Street <br />St. Paul, MN 55102 RECH]V:iD <br />MAR 2 5 1999 <br />RE:Proposed New Orono Middle School <br />Reconstruction of Orono High School <br />Orono. Minnesota <br />CITY Or OaCA'O <br />Dear George: <br />/\s a response to condition item U2 stated in the City ofOrono's Notice of Planning Commission Action <br />(dated March 16, 1999), we offer the following comments: <br />We have reviewed Wallace C.ase’s letter dated, March 14, 1999. Our responses noted below correspond <br />to Mr. Case's paragraphs. <br />I.Parking l,ot Issues - <br />Pedestrian traffic across islands will be directed over pavement. Also at these crossings, handicap <br />ramps/acccss will be provided. <br />Currently, the 5% gradient in the parking lots and drives meets ADA requirements. Ofeourse. if <br />these gradients can be decreased that would be our intent, however due to the character of the site this <br />luxury may not be obtainable. <br />Landscaping will be provided around the High Scht>ol and Middle School bus/event parking areas as <br />budget permits. <br />I.ighting - This issue is currently under review by Wold Architects. <br />3.Wetlands Creation - Plans and specifications are currently being reviewed by the Minnehaha Creek <br />Watershed District and, at present, preliminary findings are generally positive. <br />4.Athletic Field Orientation - Due to school ’s anticipated coaching / supervision needs and to allow <br />flexibility of the designed fields, the softball fields have been oriented as shown. Furthermore, the <br />orientation of the soccer fields, although not preferred, allows for the largest length and width of the <br />field (if fields were rotated north-south, the fields would fall below regulation size). At present <br />benches, bleachers and perntanent goals are not included in the project but may be installed in the <br />future. <br />5.Land.scaping - Mr. Case’s comments and suggestions will be taken into account when developing the <br />final landscape plan for each of the project sites. As previously indicated, the amount of landscaping <br />shown on the plans was provided in order to meet anticipated City guidelines. With the final design of <br />the campus landscape master plan, we will strive to link the two schools with a distinct theme and a <br />varied palette of plant material. Tree relocation issues will be further defined as we come closer to <br />bidding the project. <br />VALLEY SQUARE OFFICE CENTER • SUITE 200 • 7575 GOLDEN VALLEY ROAD • MINNEAPOLIS. MN 55427 <br />PH (612) 544-7129 • FAX (612) 544-0531