My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-12-1999 Council Packet
Orono
>
City Council
>
1999
>
04-12-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 1:44:00 PM
Creation date
4/6/2023 1:35:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
stnicture with more than two leads be 15 inches. Based on this, the 12-inch pipe downstream from CB <br />7 should be 15 inches. Riprap should be provided at all storm sewer inlets and outlets. All flared end <br />sections should have trash guards. A drainage area map along with storm sewer and ponding calculations <br />should be submitted for review. Outlet structure details should be provided. The proposed pond on the <br />west side of Old Crystal Bay Road is shown outletting to an existing wetland. The outlet for this wetland <br />and impacts downstream should be reviewed. Plans should be submitted to the Minnehaha Creek <br />Watershed District (MCWD) for their review. <br />5. Easements: The plan set submitted to us did not include a plat drawing. Final platting should include <br />66 feet of dedicated right-of-way for Old Crystal Bay Road if it doesn’t already. Drainage and utility <br />easements should be provided 5 feet wide along all interior lot lines and 10 feet wide along all exterior lot <br />lines. Drainage easements should be provided across all ponding areas and drainage ways. A 20-foot <br />wide utility easement should be provided for future water main extension to the east. The easement should <br />be centered on a line located 30 feet south of the south edge of the proposed soccer fields, extending from <br />the east lot line to the proposed 12-inch water main. Permanent and temporary easements should be <br />provided for the Hennepin Parks trail that is scheduled to be constructed this summer. <br />6. Financial Guarantee: When the plans have been completed we will prepare an estimate of the total cost <br />for the site improvements to determine the amount of the financial guarantee required. <br />Please contact me at 651-604-4863 if you have any questions regarding this matter. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br />Tom Kellogg <br />Cc: Greg Gappa, City of Orono
The URL can be used to link to this page
Your browser does not support the video tag.