My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-1999 Council Packet
Orono
>
City Council
>
1999
>
02-22-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 1:36:46 PM
Creation date
4/6/2023 1:33:29 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0210 99 FRI 10:22 FAX 0000 <br />ORONO CITY COUNCIL MEETING <br />MINUTES FOR FEBRUARY 8,1999 <br />(Hi) #2425 SIDNEY AND BARBARA REBERS/SERVJCE 800, INC, 2190 WAYZATA <br />BOULEVARD - Continued <br />Gippa said that Service 800 would like to begin construction as soon as possible, but the <br />pi efcrred access options would not be approved by Mn/DOT for at least two to three months. <br />S'JTvicc 800 would like to begin construction using the existing right»in/right-out curb cut on a <br />temporary basis. As soon as Mn/DOT approval can be obtained for one of the access options, <br />they would construct a new access across from Brimhall per the revised site plan with parking <br />a>;ainst Highway 12 frontage rather than against the front of the building. <br />Jiibbour asked if the right-in/right-out would be used only during construction. <br />Cappa said the ri^t>in/right-out a'..cess would be used during construction and until the new <br />access is completed. He said that Option 1 is a reconveyance of the triangle to Clifr Otten by <br />Mn/DOT. Otten would then grant an easement over the triangle to the City of Orono. For this <br />t( . happen, Otten must acquire the underlying fee title to the triangle from the Daniels heirs. <br />Otten would have to complete acquisition of fee title from the Daniels heirs within a short <br />timeframe (30 days). <br />Kelley asked if the heirs could be contacted within 30 days. <br />Ciappa said the heirs are local and they can be contacted. <br />Jiibbour asked if Otten has contacted the heirs. <br />Otten smd he has not contacted them yet. <br />(iappa said Option 2 is a turnback to the City of Mn/DOT’s easement over the triangle. <br />Mn/DOT has indicated that they would approve this option. He sud that Option 3 is a fallback <br />option where Service 800 would be prepared to build a driveway across Otten’s property to <br />tiic northwest comer of the Service 800 site. Although not preferred by staff nor Service 800 <br />r or Often, this option would be locked in if the turnback and reconveyance options frul to gain <br />Mn/DOT approval. This option would require a letter of credit from the developer to cover <br />the cost of the road. <br />Kelley asked if Otten is willing to grant the easement for Option 3. <br /><■ rappa said that is peul of the road agreement between the City, the developer and Mr. Otten. <br />Mr. Barrett has been working on the rood agreement. <br />K.elley asked who would own the triangle under Option 3. <br />C rappa responded that Mn/DOT would own the triangle. <br />J ibbour asked why the City would have to be involved in the agreement. <br />Pages
The URL can be used to link to this page
Your browser does not support the video tag.