Laserfiche WebLink
Section B <br />Ventilation Method <br />(Choose either kala nced or exhaust only) <br />passive (determined from calculations from Table 501,3,11 <br />HRV (Heat Recovery Ventilator) or ERV (Energy Recovery <br />Powered (determined from calculations from Table 501.3.1) <br />Exhaust only <br />❑Balanced, <br />I✓ <br />Ventilator) —cfm of unit in low must not exceed continuous <br />❑ <br />Continuous fan rating in cfm <br />Location of duct or System ventilation rtlake-up air: Determined from snake -up air openingtable <br />ventilation tin bv more than 100%, <br />Low, dm: <br />O O <br />High cfm: <br />^ 7 ^ <br />b <br />Continuous fan rating in cfm (capacity must not exceed <br />OC7 <br />I r <br />continuous ventilation rating by more than 100%) <br />Directions - Choose the method of ventilation, balanced or exhaust only. Balanced ventilation systems are typically HRV or ERV's. <br />Enter the law and high cfm amounts tow cfm air flaw must be equal to or greater than the required continuous ventilation rate and <br />less than 100% greater than the continuous rate. (For instance, if the tow cfm is 40 cfm, the ventilation fon must not exceed 80 cfm.) <br />Automatic controls may allow the use of a forger fan that is operated a percentage of each hour. <br />Section C <br />Directions- The ventilation fan schedule should describe what the fan is for, the location, cfm, and whether it is used for continuous <br />or intermittent ventilation. The fan that is chose for continuous ventilation must be equal to or greater than the low cfm air rating <br />and less than 100% greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the continuous ventilation fan must not <br />exceed 8D cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. <br />Section D <br />Ventilation Controls <br />(Describe operation and control of the continuous and intermittent ventilation) <br />ERV has wall control- set to 50%= 88 CFM <br />ERV has wall control- set to 100%= 176 CFM <br />Directions- Describe the operation of the ventilation system. There should he adequate detail forpion reviewers and inspectors to verify design and <br />installation compliance. Related trodes also need adequate detail for placement of controls and proper operation of the building ventilation. !f exhaust fans <br />are used far building ventilation, describe the operation and location of any controls, indicators and legends. !fon ERV or HRV is to be fnstalied, describe how <br />it will be installed. If it wN be connected and interfaced with the air handling equipment; please describe such connections as detailed in the manufactures' <br />installation instructions. !f the installation instructions require or recommend the equipment to be interlocked with the air handling equipment for proper <br />operation, such interconnection shall be made and described. <br />Section E <br />Make-up air <br />✓ <br />passive (determined from calculations from Table 501,3,11 <br />Powered (determined from calculations from Table 501.3.1) <br />Interlocked with exhaust device idetermineO from (ak:ulatlonfrom Table 501,3. 1) <br />Uther, describe: <br />Location of duct or System ventilation rtlake-up air: Determined from snake -up air openingtable <br />160 Cfm " Round, 7" Flex Size and type (round, rectar�gular, flex or rigid) <br />(NR means not required) <br />