My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-17-1999 Planning Packet
Orono
>
Planning Commission
>
1999
>
05-17-1999 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2023 3:22:56 PM
Creation date
3/22/2023 3:18:06 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br />on the east side of Stubbs Bay Road and is classified as being highly suscq)t%le to storm <br />water flows. A water quality pond should be constructed on Lot 1 or Lot 7 to treat water <br />from the site prior to discharging into wetland LC^C-32. A drainage area map, storm sewer <br />and ponding calculations should be provided with the final plan set Final plans should be <br />submitted to the Minnehaha Creek Watershed District for their review. <br />4. Easements: Final platting should include 33 feet of dedicated right-qf-vyay for Stubbs Bay <br />Road. Drainage and utility easements should be provided 5 feet wide along all interior lot <br />lines and 10 feet wide along the roadway right-of -ways. Drainage easements should be <br />provided aaoss all wetland, drainage way and pond areas. <br />5. Financial Guarantee: When the plans have been completed we will prq>are an estimate of <br />the total cort for the site inq)rovements to determine the amount of the financial guaraitee <br />required. <br />Please contact me at 651-604-4863 if you have any questions regarding this matter. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br />TomKello^ <br />Cc: Greg Gappa, City of Orpno <br />. •
The URL can be used to link to this page
Your browser does not support the video tag.