My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-17-1999 Planning Packet
Orono
>
Planning Commission
>
1999
>
05-17-1999 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2023 3:22:56 PM
Creation date
3/22/2023 3:18:06 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bonestroo <br />ly-^ Rosene <br />'ssnEi Anderlik & <br />Associates <br />Engineers & Architects <br />■ Aprils, 1999 ' <br />• * <br />Elizabeth VanZomeren <br />City Planner/Zoning Administrator <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay, MN 55323 <br />Re: Peter Andrea Subdivision <br />File No. 139-2479 <br />Bonestroo, Rosene. Anderilk snd Assodstes. Inc. Is sn Afrrmsclve AcUon/Equel Opportunity Employer <br />prindp^ls: Otto G. Bonestroo. PE. • Joseph C. Anderlik. PX. • Marvin L Sorvale. PX. • <br />Richjrd E. Turner. PX. • Glenn B. Cook. PX. • Robert a Schunicht. PX. • Jerry A. Bourdon. P.X • <br />Robert W1 Rosene. PX, *nd Susan M. Ebernn. CAA.. Senior Consultants <br />Assodste Prindpsts: Howard A. Sanford, PX. • Keith A. Gordon. PX. • Robert R. Pfefferle. PX • <br />Richard W. Foster. PX • David O. Loikota. PX • Robert C Russek. AJj^ • Mark A. Hanson. PX • <br />Michael T. Rautmann. PX • Ted KXield. PX • Kenneth P. Anderson. PX • Mark R. Rolfs, PX • <br />Sidney P. Williamson, PX, LI • Robert F. Koismith • Agnes M. Ring • Michael P. Rau. PX • <br />Allan Rick Schmidt. PX <br />Offices: Sl Paul. Rochester. Wlilmar and SL Cloud, MN • Milwaukee. WI <br />Wet) site: wwwJbonestroo.com <br />E <br />Dear Liz: <br />We have reviewed the preliminary plat for the proposed seven-lot subdivision for the Peter <br />Andrea Company. The site is located west of Stubbs Bay Road North and south of TH 12 in the <br />north half of Section 32. We have the following comments in regards to engineering matters. <br />1. Access: The proposed access location off from Stubbs Bay Road appears acceptable. The <br />proposed roadway will need to have a minimum paved width of 28 feet to meet City <br />standards for a public or private street serving 7 or more units. The proposed cul-de-sac is <br />a-proximately 1100 feet long where City standards allow for a maximum cul-de-sac length of <br />1000 feel. The plans should be reviewed for any conflicts with the future realignment of <br />T.H. 12. The developer should be aware that the City will reconstruct Stubbs Bay Road this <br />summer and eliminate the at grade railroad crossing and the existing access at T.H. 12. There <br />is a need for a future east west roadway between Stubbs Bay Road and Orchard Park Road. <br />It makes sense at this time to make provisions for a future westerly extension of the proposed <br />roadway serving this property. City staff should research and further review possible <br />alignments for a future westerly roadway extension prior to preliminary plat approval. It may <br />make sense to dedicate 33 feet of right-of-way along some or all of the west boundary of the <br />parcel. Thirty-three feet of right-of-way currenUy exists west of the west property boundary. <br />Thirty-three feet of right-of-way also exists from the southwest comer of this parcel to <br />Orchard Park Road. Final plans should include geotechnic.il recommendations and street <br />design including horizontal and vertical curve information. <br />2. Grading; A grading and erosion control plan for the entire site should be submitted for <br />review. It appears that driveway and street construction will require some wetland fdling. <br />Driveway locations should be shown and wetland impacts identified on the final plan set. <br />Erosion control measures should be in place prior to any grading, particularly along the <br />wetlands. Additional erosion control will be needed during construction of the houses and <br />septic systems. <br />3. Drainage: The draft version of the City’s’ Comprehensive Storm Water Management Plan <br />(SWMP) shows that the site lies within two major drainage districts. The northerly and <br />southerly portions of the site flow to the west and lie within the Painters Creek drainage <br />district. Final plans should include water quality provisions for storm water leaving the <br />northerly and southerly portions of the site. The central portion of the site flows easterly and <br />lies within the Lake Classen drainage district. The receiving water body for the Lake Classen <br />portion of the site is a wetland identified as LC-C-32 in the SWMP. The wetland is located <br />2335 West Highway 36 ■ St. Paul, MN 55113 • 651*636*4600 ■ Fax; 651*636*1311
The URL can be used to link to this page
Your browser does not support the video tag.