My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-2000 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2000-2009
>
2000
>
09-18-2000 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2023 4:21:23 PM
Creation date
3/16/2023 4:17:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />\ <br />MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />AUGUST 21,2000 <br />The Certificate of Mailing and Affidavit of Publication were noted. <br />Weinberger stated the Planning Commission had reviewed this application at their June meeting, <br />which consists of developing a seven acre site located on Wildhurst Trail. The Applicant has <br />revised his plans and is now proposing access via Garden Lane. The previous proposal had shown <br />six lots, with some issues relating to driveway access to the property and drainage concerns. The <br />Applicant has reduced the number of lots to five in response to the concerns of the <br />Planning Commission as well as addressed the issues relating to grading and drainage. <br />Weinberger stated in response to the concern about protection of the ravines and controlled water <br />ninoff to properties east of Wildhurst Trail, the Applicants have revised the grading plan and <br />addressed the issues by directing draiitage to two storm^vatcr management ponds. ITie City <br />Engineer reviewed the grading and drainage plan and has determined the drainage has been <br />preliminarily approved. Both of the proposed ponds \vill reduce the amount of water runoff to <br />what actually exists today as well as providing skimming to allow the water to be treated prior to <br />leaving the site. Weinberger noted this plan would also be subject to review and approval by the <br />DNR and the Minnehaha Watershed District. <br />Secondly, the issue relating to street access has been addressed by revising the plan to make a <br />90 degree controlled intersection %vith Garden Lane. The northerly ravine in this development <br />would be protected by a conservation easement and a lot has been removed that would have <br />required access around the ravine. <br />Weinberger stated the number of proposed lots has been reduced from six to five based on the <br />recommendation of the Planning Commission, which has resulted in each lot meeting or <br />exceeding the one acre minimum lot size. <br />Weinberger stated City Staff is strongly recommending the developer not disturb the trees and <br />grades east of the cul-de-sac along Wildhurst Trail. The portion of the sewer that \\ould be <br />PAGE 18 <br />.1 <br />J
The URL can be used to link to this page
Your browser does not support the video tag.