My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-21-2000 Planning Packet
Orono
>
Planning Commission
>
2000
>
08-21-2000 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2023 4:22:49 PM
Creation date
3/16/2023 4:17:19 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
flUG-16-21 10:06 MINNEHAHA CREEK UATERSHED <br />L •n 6124710682 P.02/02 ’ <br />% <br />Pennit Application No.: 00»139__________ <br />Applicant; James Rencke^Q____________ <br />Project: Wetland excavation for wildlife <br />Rule: B. D <br />enhancement <br />Location: 3020 Watertown Road. Orono <br />Received: 4/24/00 <br />Complete: 4/25/00 <br />Recommendation: ~ ^ ---------------- <br />Approval. Permit should not be issued until the following conditions are met; <br />1. Sureties of $3,900 for erosion control and $5,550 for wetland alteration must be received. <br />2. A declaration for preservation of the wetland buffer must be executed and recorded. <br />3. Rule J fees must be paid. <br />Background: <br />The project plans for excavation of the wetland on the property to provide for wildlife <br />enhancements. Rules B and D apply. <br />Rule B <br />The erosion control plan meets Rule B requirements and includes silt fence around the excavated <br />wetland. An erosion control surety of S3,900 is required as per the surety schedule approved by <br />the Board of Managers. <br />Rule D <br />Excavation in the wetland follows DNR guidelines for wildlife enhancement, therefore, no <br />mitigation is required. The revegetaiion plan will restore native plants and decrease the number <br />of invasive species. The wetland buffer will be decompacted and revegetated where it is <br />damaged to access the wetland for excavation. The buffer must be recorded before a pennit is <br />issued. A wetland alteration surety of $5,550 is require^. <br />Attachments; <br />1. Application received 4/24/00. <br />2. Site location map. <br />j.Site Landscape Plan dated 3/7/00 revised 4/21/00. <br />Lisa A. Tilman Date <br />T:\0l85\01\l5l\app00 139.doc <br />04 28/00 <br />TATAI P.0P
The URL can be used to link to this page
Your browser does not support the video tag.