Laserfiche WebLink
ORONO PLANNING COMMISSION <br />MINUTES FOR APRIL 17,2000 <br />(#2576 Brenshell Homes, Continued) <br />driveways being located on the road when alternative access is available through Garden Lane. <br />City Staff is recommending that all access for the development be via a new road constructed by <br />the developer through Garden Lane with a cul-de-sac serving any lots within direct access. <br />Lindquist inquired whether there will be access to Saga Hill Park from Garden Lane. <br />Weinberger stated at this time Garden Lane could be used as access to the park. Weinberger <br />stated other access and parking to the park has been provided through the property formerly owned <br />by Palmer and the Covenant Church. Weinberger noted he has not reviewed the plan in much <br />detail at this time. <br />Steve Bentley, Prudential Homes, stated he has received a significant amount of information from <br />City Staff relating to prior developments proposed for this site and has revised the plans somewhat <br />to address Staffs concerns. Bentley stated basically they are proposing a road off of Garden Lane <br />for access to this development. Bentley stated they currently have a builder lined up for this <br />project and are very interested in proceeding forward with their proposal. <br />Bentley commented in light of the prior proposals, they are considering the possibility of a lift <br />station and connection to sanitary sewer from Tonkaview Road. Bentley indicated he does not have <br />a problem with any of the issues raised by City Staff and is willing to continue to work with the City <br />to resolve those issues. <br />Bentley stated it is his understanding that park access is through Tonkaview and will not need <br />access off of Garden Lane. Bentley stated they are anticipating the road would become public <br />based upon the comments on the prior applications. <br />Gaffron recommended that the road become a public road, with the cul-de-sac paved diameter being <br />80 feet. <br />Stoddard inquired what the lot width for each lot would be. <br />Bentley stated a variance to lot width will probably be needed on three of the lots due to the limited <br />amount of frontage available. <br />Gaffron recommended Bentley speak with the Public Works Department regarding sewer connection <br />and the possibility a lift station may not be needed. Gaffron noted that the City Engineer will also be <br />requiring stormwater calculations for this area. <br />Hawn commented she likes the limited amount of driveways being proposed for this subdivision. <br />Hawn indicated there has been some interested expressed in the past for clustering in this area. <br />Bentley indicated he will be obtaining more detailed engineering drawings. Bentley stated he would <br />be willing to look at clustering for this area. <br />Gaffron stated in his view it is doubtful the City Council would grant any building variances. <br />Gaffron suggested the developer do a preliminary sketch showing the clustering as an option. <br />Bentley stated he will continue to work with City Staff to resolve the issues. <br />Page 26