Laserfiche WebLink
the site. <br />A small portion of the Tract G is platted to the center of Brown Road. Hennepin County has <br />indicated it would require the west 33’ be dedicated to the County for right-of-way. <br />5.A Homeowner’s Association shall be created for the maintenance of the private road and <br />drainage structures within the development. The owner of the 130 Brown Road property, <br />southwest of the development and south of Tract G, has access from the private driveway <br />within Tract G and shall become part owner of a private road. <br />Sketch Plan <br />The City Council and Planning Commission have reviewed the proposal as part of the Sketch Plan <br />review process. Please note the attached Minutes (Exhibits J and K). <br />The City Council recommended to the property owner the City of Orono has no intent to rezone the <br />property from the two acre standard. The Council has indicated they would consider developing the <br />site as a PRD and make a provision for sewer. <br />Access <br />The City Engineer has commented (Exhibit E) the proposed access to the property be platted as part <br />of the subdivision and not by easement. Further, he recommends that the access to the site should <br />meet a minimum 50’ width to meet City roadway standards for a public or private street. <br />Drainage and Ponding <br />The draft version of the City’s Comprehensive Stormwater Management Plan shows that the site lies <br />within the Tanager Lake drainage district. The ponding location is shown on the prelimmary survey. <br />Final grading plans should include final pond grading including a 10:1 aquatic bench 10-feet wide <br />at the pond normal water level. The outlet structures shall be provided on the final plans indicating <br />the location and actual size of the pond. The City Engineer will require Best Management Practices <br />in all areas where stormwater can not be treated by the NURP pond. <br />Sanitary Sewer <br />A MUSA amendment is required to allow sanitary sewer service to the property. Sewer service has <br />been discussed and a feasibility report has been completed for the Fox Ridge neighborhood south <br />of the Luce Line Trail. The report identified a pressure sewer system as the most feasible to seive <br />the neighborhood. The pressure sewer would be routed up South Brown Road to an existing gravity <br />sewer on Watertown Road. This system would have the potential to serve properties north of Fox <br />^^2550 Charles Van Eeckhoul <br />120 Bro\¥n Road South <br />Subdivision <br />1/1900 <br />pagt-3 <br />J