Laserfiche WebLink
Establishment of a Subregional Housing Redevelopment Authority <br />fHRA^: and <br />Protection of Existing Housing, <br />Housing Needs Related to Highway 12 Bypass <br />The Highway 12 Bypass expected to be completed ca. 2006 will result in the <br />acquisition bv MnDOT in 2000-2001 of approximately 90 homes within the City of <br />Long Lake and another in Orono. The Citv of Lone Lake does not have <br />sufficient land area to accommodate relocation of these homes, many of which are <br />in the $ 1 00.000-200.000 price ranee. <br />Orono’s CMP now proposes to expand the MUSA in the area east of Willow Drive <br />between the Burlington Northern Railroad and Watertown Road, and plans to re­ <br />guide this area from 2-acre Rural SFR to Urban SFR at a density of 2-3 units per <br />acre, similar to the adjoining development in Orono’s Hackberrv Hill neighborhood <br />and to abuttinu residential development in Lone Lake. The primary purpose for this <br />expansion is to provide land for in-kind relocation of Lone Lake home displaced bv <br />the Highway 12 Bypass. <br />Because market forces would potentially tend to result in development of this <br />area with homes in the S250.000-500.000 ranee, the Cit>' of Orono will <br />investigate and promote methods bv which the desired price range housing can <br />be assured. <br />I <br />I <br />I <br />I <br />I <br />1 <br />CMP3C-21