My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-18-2000 Council Packet
Orono
>
City Council
>
2000
>
12-18-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 10:09:18 AM
Creation date
3/15/2023 10:08:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r . t <br />2. <br />3. <br />4. <br />b.Final street, sanitary sewer, grading and stormwater management designs <br />shall be provided for approval by the City Engineer. <br />c.Subdivider shall concurrent with road construction, construct stormwater <br />management improvements generally as shown on the Preliminary Grading, <br />Drainage and Erosion Control Plan reviewed and approved by the City <br />Engineer subject to any revisions of said plan as may be required by the City <br />Engineer. A final Gradin2. Drainage & Erosion Control Plan must be <br />a pproved bv the City Engineer prior to release of final plat for filing. Erosion <br />control shall be maintained over all disturbed areas until natural groundcover <br />is restored, adhering to guidelines found in 'Best Management Practices for <br />Protecting Water Quality in Urban Areas'. <br />d.All final sewer and storm water management plans shall be reviewed and <br />approved by the City Engineer prior to release of the plat for recording. <br />e.No building permits will be issued until tiie road base w'ork initial paving and <br />all improvements as referenced in the Developer’s Agreement and <br />Resolution No. 4408 have been completed by Uie developer and approved by <br />the City. <br />Plat shall not be filed until final approval of the stormwater management plan by <br />the MCWD. <br />Fin: ! covenants, easement documents and maintenance agreements shall be <br />approved by the City Attorney, including language within the maintenance <br />agreements that would establish the City of Orono’s authority to require <br />maintenance and assess fees to the property owners within Wildhurst Woods. <br />Payment to the City of Orono sewer and water connection fees: Based on the year <br />2000 Fee Schedule sewer and water connections fees are. <br />Sewer $ 9,065 per unit <br />$ 9.065 per unit X 4 units = $ 36.260 <br />Page 3 of 6
The URL can be used to link to this page
Your browser does not support the video tag.