Laserfiche WebLink
• <br />Requ st for Co .cil Action continued <br />Pa 2 <br />o mb 3 200 <br />allahan A al <br />B au over 2 years h ve passed since th storm and the entire building r quire replacement it s Staff <br />positi a varian..._e • db q ·red to rep ace he bu1 d" g. <br />nfortunately the 1ty of Orono does not have ny records relat ng to e condition of the buil • g at the <br />time of th May 1998 storm It 1s not known when �e deter·oration occurred, since the building has not <br />been in e for more than 2 year . <br />COUNCIL OPT O S FOR ACTIO 1 <br />App_ e th appea to pennit Staff to is ·ue c1 b ild'ng p mtlt bas don th procedures establish d •· · airs/ eplacemen to storm damaged tructures. Making a fl ding the building had ot <br />ext. r ed us seful i eat the tim of the storm and not more than 75% of the build. r c i . d <br />damag <br />2.Deny e appeal based on th condition of building a r the May, 1998 ................ 1. (Becau ea site <br />inspection was not comp eted after the stonn mo e than 2 ye rs ago the condition of the structur <br />at th t f i · o own.) A variance application ould be required der this opti n if r p acem n i requested.