Laserfiche WebLink
2.The drainage off structures that wo aid be located on Lots 2 and 3 would concentrate <br />drainage down the slope towards Wildhurst Trail creating an erosion concern. <br />Drainage should be redirected to tie cul-de-sac where the drainage would enter the <br />storm sewer and flow towards the northern NURP pond. <br />3.Staff has recommended to the subdivider the common property line between Lots 2 <br />and 3 should be shifted to the north to allow the building site for Lot 2 to move away <br />from the drainage area and ravine to protect the southerly ravine area on the south <br />property line of Lot 2 from greater erosion concerns. <br />4.Staff has recommended shortening the cul-Je-sac to enable the homes on Lots 2 and <br />3 to be constructed on flatter land. <br />2000. <br />Adopted by the City Council of the City of Orono on this 1 1th day of September, <br />ATTEST: <br />Linda S. Vee, City Clerk Gabriel Jabbour, Mayor <br />STATE OF MINNESOTA <br />COUNTY OF HENNEPIN <br />ss. <br />The foregoing instrument was acknowledged before me on this 11th day of <br />September, 2000, by Gabriel Jabbour & Linda S. Vee, Mayor & City Clerk of the City of Orono, a <br />Miimesota municipal corporation and said instrument was executed on behalf of the City. <br />Notary Public <br />Page 2 of2