My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-2000 Council Packet
Orono
>
City Council
>
2000
>
08-14-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 9:28:31 AM
Creation date
3/15/2023 9:23:31 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
>* <br />Application Date: 6/21/00 <br />Deadline: 10/19/00 <br />MEETING <br />AUG 1 4 2000 <br />11 Unu<vu <br />REQUEST FOR COUNCIL ACTION <br />DATE: August 1,2000 <br />ITEM NO.: <br />Department Approval: <br />Name Paul Weinberger <br />Title Zoning Administrator <br />Administrator Reviewed:Agenda Section: <br />Zoning <br />Item Description: <br />Zoning Dbtrict: <br />Lot Area: <br />List of Exhibits: <br />i/2602 Thomas and Jennifer Graham <br />1065 Tamarack Drive <br />Subdivision <br />RR-1B One Family Rural Residential District (2 acre) <br />5.1 acres <br />A Site Plan/Preliminary Plat <br />B Draft Resolution <br />C Planning Conunission Minutes (July 17,2000) <br />D Planning Report (July 10,2000) <br />Application Review: <br />The property is a developed 5.1 acre property that is proposed to be subdivided to create a second <br />2.0 acre building site north of the existing house. The existing lot was platted as part of the <br />Underhill Farms Addition in 1976. A pond is located on proposed Lot 2. A Flowage and <br />Conservation Easement was granted at the time the Underhill Farms Addition was recorded. <br />Both lots meet or exceed the standards of the Zoning and Subdivision Codes. Hennepin County has <br />requested additional right-of-way for trail purposes along County Road 6. The right-of-way <br />requested would be 50' from the center line of the road. This would require about 1 O' of additional <br />right-of-way for future trail purposes. The first 40' had been previously acquired by Hennepin <br />County. The right-of-way would be dedicated on the final plat. <br />The proposed Comprehensive Plan and Trail Plan has designated this portion of the trail as a futiue <br />connection to the regional system. <br />Future use of existing barn located on proposed Lot 1: <br />The Planning Commicsion recommended an 18 month time period the accessory building could be <br />left on Lot 1 without a building permit. The property owner has stated they do not intend to sell the <br />lot for development for an extended time period beyond the 18 months as suggested by the Planning <br />Commission. Property owners have stated the building is in very good repair and would like to keep
The URL can be used to link to this page
Your browser does not support the video tag.