My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-2000 Council Packet
Orono
>
City Council
>
2000
>
08-14-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 9:28:31 AM
Creation date
3/15/2023 9:23:31 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mooney Lake Outlet <br />Feasibility Study <br />Table of Contents <br />I.Introduction <br />II.Background <br />III.Evaluation of Options <br />A.Route and Cost Analysis <br />B.Hydraulic Considerations <br />C.Other Considerations <br />D.City Staff Input <br />IV.Recommendations <br />A.Recommended Option <br />B.Recommended Cost - Sharing <br />Fieures <br />Figure 1 — Mooney Lake Drainage Area <br />Figure 2 — Mooney Lake Outlet Options <br />Figure 3 - Proposed Outlet, Lift Station, and Stormsevver Alignment <br />Tables <br />Table 1 - Approximate Project Cost Allocation Based on Equivalent Runoff <br />Table 2 - Estimated Total Capital Cost Allocation Per Land Parcel <br />Appendices <br />Appendix A <br />Page Nos. <br />1 <br />1 <br />1 <br />1 <br />7 <br />8 <br />8 <br />8 <br />8 <br />11 <br />2 <br />4 <br />9 <br />12 <br />13 <br />Back of Report
The URL can be used to link to this page
Your browser does not support the video tag.