Laserfiche WebLink
Mooney Lake Outlet <br />Feasibility Study <br />Table of Contents <br />I.Introduction <br />II.Background <br />III.Evaluation of Options <br />A.Route and Cost Analysis <br />B.Hydraulic Considerations <br />C.Other Considerations <br />D.City Staff Input <br />IV.Recommendations <br />A.Recommended Option <br />B.Recommended Cost - Sharing <br />Fieures <br />Figure 1 — Mooney Lake Drainage Area <br />Figure 2 — Mooney Lake Outlet Options <br />Figure 3 - Proposed Outlet, Lift Station, and Stormsevver Alignment <br />Tables <br />Table 1 - Approximate Project Cost Allocation Based on Equivalent Runoff <br />Table 2 - Estimated Total Capital Cost Allocation Per Land Parcel <br />Appendices <br />Appendix A <br />Page Nos. <br />1 <br />1 <br />1 <br />1 <br />7 <br />8 <br />8 <br />8 <br />8 <br />11 <br />2 <br />4 <br />9 <br />12 <br />13 <br />Back of Report