My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-2000 Council Packet
Orono
>
City Council
>
2000
>
08-14-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 9:28:31 AM
Creation date
3/15/2023 9:23:31 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
; >: <br />^ iBonestroo <br />Rosene <br />^ ■ Anderlik & <br />\ Associates <br />Engineers & Architects <br />Bonestroo. Rosene. Anderlik end Associetes. Inc. Is an Affirmative Acifon/Equal Opportunity <br />Emproyer and Employee Owned <br />Principals: Otto G Bcnestroo. PE. • Marvin L Sorvai?. PE • Cienn tf Cook. PE • <br />Robert G Scnunicht. P£. • Jerry A. Bourdon. PE <br />Senior Consultants: Robert W Rosene. PE. • Joseph C Anderlik. PE • Richard E Turner. PE • <br />Susan M. Eberim, C PA <br />Associate Principals* Howard A Sanford. PE • Keit.i A. Gordon. PE • Robert R. Pfefferte. PE • <br />Richard W Foster. PE • David O Loskota. PE. • Rcter: C Russek, A.I A. • Mark A. Hanson. PE. • <br />Michael T. Rautmann. PE. • Ted K.Fieid. PE. • Kenneth P Anderson. PE. • Mark R. Rolfs. PE. • <br />David A. Bonestroo. M B A. • Sidney P. a'llliamson. Ft. LS. • Agnes M Ring. M B A • Allan Rick Schmidt. PE <br />Offices: St. Paul. St Cloud. Rochester and Wiiimar. MN • Milwaukee. Wl <br />VP^bsIte: WWW bonestroo com <br />Jane 15,2000 <br />Ms. Glenda Spiotta <br />Minnehaha Creek Watershed District <br />2500 Shadywood Road <br />Excelsior, MN 55331-9578 <br />Re: Mooney Lak? Outlet Feasibility Study-Final Report <br />Our File No. 633-99-100 <br />Dear Glenda: <br />Please find enclosed 15 copies of the final report for the Mooney Lake Outlet Feasibility <br />-. Study. The recommended project is physically feasible. Cost estimates and <br />recommendations for financing/cost allocation are included in the report. Should the <br />Board authorize construction of the project, we estimate 5-8 months will be required to <br />design the project, secure easements, and complete construction. A decision regarding <br />operational responsibilities for the lift station will also be needed from the Board. <br />Wc would be pleased to discuss the report wth the Board or other interested parties. In <br />the meantime, don’t hesitate to contact me at (651) 604-4783. <br />Respectfully submitted, <br />BONESTROO, ROSENE, ANDERLIK AND ASSOCIATES, INC. <br />Rich Brasch <br />cc.Tom Peterson <br />Ismael Martinez I hereby certify that this report was prepared <br />by me or under my direct supervision and <br />that I am a duly Registered Professional <br />Engineer under the laws of the State of <br />Minnesota. <br />iA. <br />Thomas W. Peterson <br />Date: May 30,2000 Reg. No. 16610 <br />2335 West Highway 36 • St. Paul, MN 55113 • 651-636-4600 • Fax: 651-636-1311
The URL can be used to link to this page
Your browser does not support the video tag.