My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-2000 Council Packet
Orono
>
City Council
>
2000
>
08-14-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 9:28:31 AM
Creation date
3/15/2023 9:23:31 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
August 8. 2000 <br />121.074.75 <br />121.074.75 <br />85J81.90 <br />noo <br />85.581.90 <br />4J279.10 <br />81,302.81 <br />15.197.86 <br />0.00 <br />66.104.95 <br />*.'.y <br />'"''••MCIL MEETING <br />REQUEST FOR COUNCIL ACTION AU6 1 4 2000 <br />DATE: Augufa4,^fo85®^® <br />ITEM NO.: 11 <br />Department Approval: <br />Name Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed:Agenda Section: <br />'/.Public Services's Directors Report <br />Item Description: Electric Service for the Highway 12 Lift Station <br />Provision of electric service for the new Highway 12 relief sewer capacity lift station will require <br />the installation of a new overhead transformer on the high voltage power line on the north side <br />of Highway 12 and installation of an electric service under the highway to the lift station on the <br />south side. NSP’s cost for this transformer installation is $3,873. The City is then responsible <br />for installation of the electric service from the transformer to the lift station. <br />We are working on obtaining quotations for the installation of the electric service line. The <br />estimated costs for this work are $2,600 for directional boring of a conduit under Highway 12 <br />plus $1,000 for the electric cable and connection. The City will obtain quotations and have the <br />directional boring completed by one of the boring contractors working on other sewer projects in <br />the City. The electric cable installation and connection can be completed by the electrician <br />working on the lift station project. This will require a change order because the lift station <br />contract was based on the contractor connecting to a new pad mounted transformer installed next <br />to the lift station. The cost for NSP to install high voltage primary cable under Highway 12 and <br />a pad-mounted transformer next to the lift station was $17,000, so decision to have an overhead <br />transformer and low voltage electric service was made. Also, because of the temporary nature of <br />the lift station this is a better option. <br />We are recommending Council approval for NSP to install the transformer at this time, so they <br />can complete their work. Council approval for the other items will need to be obtained later. <br />COUNCIL ACTION REQUESTED: <br />Motion to approve installation of an overhead transformer for the new Highway 12 sanitary sewer <br />lift station by NSP in the amount of $3,873.
The URL can be used to link to this page
Your browser does not support the video tag.