Laserfiche WebLink
^■y <br />'ft <br />ii <br />i <br />t^:''6 • <br />K. <br />: <br />■ i ■ <br />m. Exterior site work to include the following: <br />a. <br />b. <br />c. <br />d. <br />e. <br />f <br />New sidewalks to all entry/exit locations. <br />New porch/deck on north side adjacent to the paddle tennis courts. <br />Water line from existing well <br />Connection from sanitary sewer line to new barn addition. <br />Alterations to existing parking lot to tie into new building.i <br />Fill and grade work to access various building entry points as well as <br />water runoff control. <br />This is a schematic list of work proposed at this time for which a preliminary ballpark <br />estimate has been prepared. More detailed work will be discussed with the committee <br />before final construction documents are prepared. <br />Regards, <br />Mark A. Albrecht, CCM <br />Woodhill Country Club