Laserfiche WebLink
4. Any variance application mav be referred to the City Council for review <br />bv the On-Site Systems Manager. <br />F:------Building Permit Applications. No building permit shall be issued by the City <br />for any new building which that will be connected to a new an on«site sewage treatment.sys tem until <br />the site evalua tion report and an on*s ite sys tem design specifications as required by the MPCA <br />Regulations Chapter 7090 and the City Code have has been revi ewed and approved by the City. No <br />building pemtit shall be issued for any construction within a designated drainfield site (within the <br />setback from said drainfidd site) until another drainfield site is approv ed by the City. Where the <br />constructiun of additional bedrooms, bathrooms, installation of mechanical equipment, or other <br />factors likely to affect mechanical equipment likely to affect the operation of the sy stem can be <br />reasonably anticipated, the installation of a sys tem for such anticipated need shall be required on«site <br />system must be confirmed as being of adecjuate capacity for the anticipated use. IFcTcpanjion or <br />replacement of the on»site sys tem is required, an on»site sys tem design must be approve d by the City <br />prior to issuance of the building permit. Where construction on an existing building can reasonably <br />be anticipated to increase the sewage output for whatever reason, an alternate site or future expansion <br />area (if available) must be designated and protected; <br />F. Building Permit Applications <br />1. New Residence. No building permit shall be issued for anv new building <br />that will be connected to an ISTS until a site evaluation and design is approved bv the On-Site <br />Systems Manager. The site evaluation must include the identification of both primary and alternate <br />drainfield sites suitable for a minimum of a five bedroom residence. If the building will be <br />connected to an existing system, a site evaluation and design must be approved by the City including <br />the existing system specifications and a future site meeting the provisions of this Section. A new <br />residence must be connected to an ISTS meeting the definition of a code system. <br />2. Construction of additional bedrooms or construction including <br />water using anniianccs that will increase the sewage flow into an ISTS. A building permit shall <br />not be issued until the City confirms that the existing ISTS is compliant, of adequate size to treat <br />the sewage flow from the building and a future drainfield site is designed and preserved. If the <br />existing ISTS must be repaired or replaced, an ISTS design for both the existing system and a future <br />drainfield site must be approved before issuing a building permit. If expansion or replacement of <br />the ISTS is required, the system must be installed and inspected before a certificate of occupancy <br />shall be issued for the construction. Failure to identify satisfactory drainfield sites for the proposed <br />sewage flow for use now as well as a future site shall result in the denial of the building permit <br />application <br />3. Expansion of an existing building (including decks and patiosit <br />construction of an accessory building, driveway or land alteration. A future drainfield site must <br />be designed and preserved prior to the issuance of a building permit for anv of the above activities <br />Page 9 of 22