My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-09-2023 Council Packet
Orono
>
City Council
>
2023
>
01-09-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2023 2:12:48 PM
Creation date
3/13/2023 2:11:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />H:\ORNO\2023 New Projects\Fee Estimate - 2023 Sewer Improvements.docx <br /> <br />January 3, 2023 <br /> <br />City of Orono <br />Attn: Adam Edwards <br />P.O. Box 66 <br />Orono, MN 55323 <br /> <br />RE: 2023 Sanitary Sewer Rehabilitation Project <br /> <br />Dear Adam: <br /> <br />As requested, we have prepared a fee estimate for engineering design services related to the 2023 <br />Sanitary Sewer Rehabilitation Project. It is our understanding that the scope of the project will include <br />cured in place sewer lining. <br /> <br />Our scope of services for this project will include the following: <br /> <br />• Reviewing televising information <br />• Preparation of Plans and Specifications based on aerial photos and City record plan information <br />• Bidding assistance and award recommendations <br /> <br />Based on the above-mentioned scope of work, we propose a not-to-exceed fee of $26,700. Upon <br />request, a fee estimate for construction related services will be provided prior to awarding the project. <br /> <br />Please contact me if you have questions or need additional information. <br /> <br />Sincerely, <br />Bolton & Menk, Inc. <br /> <br />David P. Martini, P.E. <br />Senior Principal Engineer <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.