My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-2022 Council Packet
Orono
>
City Council
>
2022
>
12-12-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2023 2:08:07 PM
Creation date
3/13/2023 2:02:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br /> <br /> <br />on the 2014 Water Bonds. <br /> <br />2023 capital expenditures as identified in the 2023 CIP include a water plant upgrades, north tower <br />cleaning and inspection, and water valve replacements. The Water Fund’s anticipated cash balance for the <br />fund at the end of 2023 is $1,157,150. <br /> <br />b. Sewer. As presented, the operating budget for 2023 will have an operating income of $142,575. <br />Net non-operating revenues and expenses increase the income to $194,175. The single largest expense for <br />the sewer fund is the Met Council disposal charges which has increased from $394,530 in 2016 to $766,993 <br />in 2023. This is a 94% increase and has a major impact on sewer rates. The total operating expense budget <br />is increasing by $154,565 (7.9%) The major increases are the previously mentioned MCES charges <br />($62,000), Personnel Services (30,340), and Supplies ($30,340). <br /> <br />Upcoming capital expenditures can be covered by the fund’s current cash balances. Projects identified <br />in the CIP for 2023 include: Annual sewer rehabilitation, lift station updates, and the Tonkawa Force Main <br />replacement. The projected cash balance for the fund at the end of 2023 is $1,176,080. <br /> <br />c. Stormwater. The Stormwater Fund is for the most part project based. Operating expenditures are <br />mainly limited to engineering associated with NPDES, SWPPP and other state and federal requirements. <br />Public Works time and materials spent on culvert cleaning/replacement are also charged to this fund. The <br />purpose of this fund is to collect money for the larger Stormwater projects that will be required in the future. <br /> <br />Potential CIP projects in 2023 include: Projects performs in conjunction with road projects, Navarre <br />parking lot manholes, Cherry Place Ravine Improvements, and other Storm Water Improvements. The <br />projected cash balance for the fund at the end of 2023 is $1,838,546. <br /> <br />d. Recycling. The recycling funds major expenditure line is for contracted recycling charges. The <br />current contract with Waste Management is increasing 4%. The full time wages that are charged to the <br />fund represent 10% of the City Clerks wages. The projected cash balance for the fund at the end of 2023 <br />is $70,382. <br /> <br />e. Cable. The Cable funds projected revenues are based on current subscriber information and <br />rates. The line item for Internet/Other communications covers the costs associated with streaming and <br />online access of council meetings. It has been increased to pay for the increased cost of our fiber internet <br />connection. Revenue for the fund is in the from franchise fees that are set by the City’s franchise <br />agreement with Mediacom. The projected cash balance of the fund at the end of 2023 is $100,000. <br /> <br />9. Construction Funds. The City does not adopt formal budgets for construction funds. Possible <br />projects for these funds can be found in the CIP. The CIP is a planning tool only; approval of the CIP not <br />approve or authorize any purchases. The projects identified in it will require individual approval from the <br />Council before they can be started. <br /> <br />10. Fee Schedule. The City’s fee schedule is reviewed annually as part of the budget process. A copy of <br />the schedule with requested changes is included as exhibit F. The most impactful change will be for <br />utility rates, with suggested increases as follows: Water – 2 %; Sewer – 2%; Storm – 2%; and Recycling <br />4%. The recycling increase simply passes on the increase in our contract with Waste management. The <br />Utility rates are increasing consistent with the amounts projected in previous rate studies and continue to <br />adequately fund infrastructure costs through the rates. <br /> <br />Another fee that is increasing relates to various zoning applications which are increasing $50 to $375. A <br />cost analysis of staff time is included as the last page of the fee schedule exhibit. The requirement for an
The URL can be used to link to this page
Your browser does not support the video tag.