My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-2022 Council Packet
Orono
>
City Council
>
2022
>
12-12-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2023 2:08:07 PM
Creation date
3/13/2023 2:02:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Orono – Orono Public Works Facility, Orono, MN <br />AET Proposal No. P-0012042 <br />September 15, 2022 <br />Page 5 of 10 <br /> <br /> <br /> Observe that the correct lengths of bar lap splices are provided. <br /> Observe that the proper clearance is provided between the bars and the masonry <br />units. <br /> Observe the general construction practices, including compliance with proper cold or <br />hot weather protection as required by the project specifications. <br /> <br />We estimate that our Engineering Technician II will make 4 trips to conduct these <br />observation and testing services. <br /> <br />Any discrepancies from the project specifications will be brought to the attention of the <br />contractor and/or their subcontractor. Daily field reports of our observations and testing <br />will be available to the contractor and other authorized site personnel. <br /> <br />While at the site the Engineering Technician II will also sample the mortar and grout. The <br />grout “prism” specimens will be cast for compressive strength testing according to IBC <br />guidelines. One set of four grout “prisms” will be cast according to the testing frequency <br />required by the project specifications. One of the “prisms” will be tested for compressive <br />strength after 7 days and two will be tested after 28 days. The fourth specimen will be <br />held for future testing, if required. <br /> <br />The project specifications state that compressive strength testing must be conducted on <br />sets of masonry block prisms cast from each size of block used during construction. Each <br />set will include a minimum 3 prisms tested at 28 days, additional prisms will be cast if <br />earlier breaks are required. The prisms will be fabricated at the site and returned to our <br />laboratory for testing. The testing will be performed in accordance with ASTM: C1314. <br /> <br /> Welded and Bolted Connection Observations <br />During erection of the structural steel frame, steel joists, and metal decking, AET will <br />provide an Engineering Technician II (AWS/ICC Certified Welding Inspector) certified in <br />accordance with ASNT to perform observations of the welded and bolted connections. <br />These services will be performed on an on-call basis when requested by the contractor. <br />Our services will include the following: <br /> <br /> Observe bolted connections for compliance with Section 9a of the "Specification for <br />Structural Joints using ASTM: A325 or ASTM: A490 Bolts" approved by the Research <br />Council on Structural Connections. <br /> Observe welded connections for compliance with the requirements of Section 6 (steel <br />frame) of the AWS "Structural Welding Code" D1.1. Fillet welds will be visually <br />observed for length, quality and suitability. Full or partial penetration welds will be <br />tested by ultrasonic or magnetic particle methods. <br /> Observe deck welds for compliance with the requirements of the AWS “Structural <br />Welding Code” D1.3. <br /> Observe deck fasteners to verify that the correct number and spacing is provided in
The URL can be used to link to this page
Your browser does not support the video tag.