My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-2022 Council Packet
Orono
>
City Council
>
2022
>
12-12-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2023 2:08:07 PM
Creation date
3/13/2023 2:02:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Orono – Orono Public Works Facility, Orono, MN <br />AET Proposal No. P-0012042 <br />September 15, 2022 <br />Page 4 of 10 <br /> <br /> <br />Any discrepancies from the project specifications will be brought to the attention of the <br />contractor and/or their subcontractor. Daily field reports of our observations and testing <br />will be available to the contractor and other authorized personnel at the site. <br /> <br />During placement of the concrete, our Engineering Technician II will also cast test <br />cylinders for compressive strength testing. Project specifications require that one set of <br />cylinders be cast for every 100 cubic yards (or fraction thereof) of each type of concrete <br />placed each day. Each set will consist of five cylinders; one which will be tested after 7 <br />days and three which will be tested after 28 days. The fifth cylinder will be held in reserve <br />for future testing, if required. AET will also pick up the cylinders from the site and return <br />them to our laboratory for moist curing and testing. The results of our compressive <br />strength tests will be presented periodically, as they become available. <br /> <br />We estimate 25 trips will be required by the Engineering Technician II to complete the <br />reinforcing steel observation and concrete testing services for reinforced concrete <br />portions of the new construction. We estimate 10 trips will be required by an ACI certified <br />Engineering Technician I for testing of non-reinforced concrete elements. <br /> <br /> Floor Flatness Testing <br />The project specifications require that a testing laboratory perform floor flatness/levelness <br />testing within 72 hours of each floor slab placement. These services will be performed <br />by an experienced Engineering Assistant. <br /> <br />The field testing will be completed in accordance with ASTM: E1155, “Standard Test <br />Method of Determining Floor Flatness and Levelness Using the F-number System.” Our <br />flatness/levelness testing will be performed using a Face Model 2272 dipstick. We <br />assume that we will have complete access to the slab surface for this testing; i.e., no <br />curing blankets, equipment or materials will be present or stored on the slab. We estimate <br />2 trips will be required to the project site for these services. <br /> <br /> Masonry Observations and Testing <br />During construction, AET personnel will perform observations during masonry wall <br />construction, as well as testing of mortar and grout (if required). Our observations and <br />testing will be performed by an experienced Engineering Technician II on an on-call basis, <br />and will include the following services: <br /> <br /> Observe that the proper size units are used. <br /> Observe that the units are clean, sound and dry when placed. <br /> Observe that the masonry bearing surfaces are clean. <br /> Observe the placement and alignment of vertical reinforcing bars and dowels, and <br />document that the correct sizes of bars are used. <br /> Observe the placement and alignment of horizontal reinforcing bars, and document <br />that the correct sizes of bars are used.
The URL can be used to link to this page
Your browser does not support the video tag.