My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-2022 Council Packet
Orono
>
City Council
>
2022
>
12-12-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2023 2:08:07 PM
Creation date
3/13/2023 2:02:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Orono – Orono Public Works Facility, Orono, MN <br />AET Proposal No. P-0012042 <br />September 15, 2022 <br />Page 2 of 10 <br /> <br /> <br /> Have reinforced masonry block walls; cast-in-place concrete walls; precast concrete <br />wall panels; a metal deck roof supported by steel joists. <br /> Be able to tolerate normal amounts of settlement for this type of structure (up to 1- <br />inch total and ½-inch differential, and up to 1-inch differential between the original <br />building and new construction). <br /> Have pavements on the E,W,N sides of the structure consisting of 4 inches of <br />bituminous over 8 inches of Class 5 aggregate base. <br />AVAILABLE BID INFORMATION <br />Project documents provided to assist us in preparing this proposal included the following: <br /> <br /> Project Architectural, Structural, and Civil Plans, dated 4/4/2022 <br /> Project Manual, dated 4/4/2022 <br />SCOPE OF SERVICES <br />Based on discussions with Thomas Stromsodt, and our review of the available plans and <br />specifications, our anticipated scope of services is outlined below. <br /> <br /> Excavation Observations and Soil Testing <br />During excavation for the building and parking lots, an Engineering Assistant from our <br />firm will visit the site on an on-call basis to perform the following services: <br /> <br /> Observe the soils in the bottoms of the excavations completed at that time. <br /> Perform shallow hand auger borings in the excavations. <br /> Perform hand cone penetrometer (HCP) probes in the excavations. <br /> Evaluate the suitability of the soils present in the excavations to support the <br />anticipated fill, structural loads and pavements. <br /> Document the elevations at various locations at the bottoms of the excavations. <br /> Document that adequate oversizing of the excavations is provided to support lateral <br />loads from the footings through the fill. <br /> <br />During placement of fill in the building excavations, pavement excavations, and utility <br />trench excavations, an experienced Engineering Technician II will visit the site on an on- <br />call basis to test the compaction of the fill. The technician will perform the following <br />services: <br /> <br /> In-place field density tests to evaluate the compaction of the fill soils using the nuclear <br />density gauge method. <br /> Standard Proctor tests for each different type of fill encountered at the test locations. <br /> Obtain samples of sand fill and/or aggregate base materials for sieve analysis tests. <br />
The URL can be used to link to this page
Your browser does not support the video tag.