Laserfiche WebLink
■site grading <br />■parking area reconfiguration to provide parking for persons with disabilities <br />■a painted cross walk <br />•interior bituminous wallo^'ays <br />■benches <br />■picnic table <br />■connection to city water supply <br />■hi lo drinking fountain <br />■yard hydrct.its <br />‘future historic fountain <br />■site lighting <br />■tree planting » <br />•two composite play structures: one for preschool age children 1-5 years old and a <br />separate play structure for 5-14 year old children <br />•new swings <br />•renovation of existing slide <br />•safe and accessible play surfacing <br />•curb ramp and connection to future city sidewalk system <br />•a split rail fence <br />•planting beds <br />•topsoil and seeding and other landscape improvements <br />Total Cost: $160,175 Grant Request: $80,000