My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-27-2000 Council Packet
Orono
>
City Council
>
2000
>
03-27-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 4:30:21 PM
Creation date
3/9/2023 4:26:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■site grading <br />■parking area reconfiguration to provide parking for persons with disabilities <br />■a painted cross walk <br />•interior bituminous wallo^'ays <br />■benches <br />■picnic table <br />■connection to city water supply <br />■hi lo drinking fountain <br />■yard hydrct.its <br />‘future historic fountain <br />■site lighting <br />■tree planting » <br />•two composite play structures: one for preschool age children 1-5 years old and a <br />separate play structure for 5-14 year old children <br />•new swings <br />•renovation of existing slide <br />•safe and accessible play surfacing <br />•curb ramp and connection to future city sidewalk system <br />•a split rail fence <br />•planting beds <br />•topsoil and seeding and other landscape improvements <br />Total Cost: $160,175 Grant Request: $80,000
The URL can be used to link to this page
Your browser does not support the video tag.