My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-14-2000 Council Packet
Orono
>
City Council
>
2000
>
02-14-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 4:25:09 PM
Creation date
3/9/2023 4:21:19 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Staff Revised Plan <br />Mobilization and Grading <br />Playground Equipment (Plan B, Pea Gravel) <br />Bituminous Trails (No Trail to North) <br />Benches, Tables and Fence <br />Planting Beds (Without Perennials) <br />Lighting <br />Yard Hydrants ( No Drinking Fountain) <br />Parking Reconfiguration <br />Subtotal <br />Contingency, 10% <br />Estimated Year 2000 Construction Costs <br />Engineering and Administration, 15% <br />$10,000 <br />$62,000 <br />$12,000 <br />$4,000 <br />$6,000 <br />$5,000 <br />$99,000 <br />10,000 <br />$109,000 <br />$16,000 <br />Estimated Year 2000 Project Costs $125,000 <br />COUNCIL ACTION REQUESTED: <br />Consideration of options for improvements to Navarre Park. <br />Consideration of recommendation for sidewalk construction along Shady v'ood Road from Crystal <br />Place to Lyric Avenue.i <br />1
The URL can be used to link to this page
Your browser does not support the video tag.