Laserfiche WebLink
Options and Cost Summaries <br />Original Neighborhood Concept Plan <br />Mobilization and Grading <br />Playground Equipment (Plan A, Woodchips) <br />Trails and Walkways ( Decorative Concrete) <br />Benches, Tables and Fence <br />Planting Beds (With Perennials) <br />Lighting <br />Drinking Fountain and Yard Hydrants <br />Parking Reconfiguration <br />Subtotal <br />Contingency, 10% <br />Estimated Year 2(XX) Construction Costs <br />Engineering and Administration, 15% <br />Estimated Year 2000 Project Costs <br />Park Commission Revised Plan <br />Mobilization and Grading <br />Playground Equipment (Plan A, Pea Gravel) <br />Bituminous Trails ( No Trail to North) <br />Benches, Tables and Fence <br />Planting Beds (Without Perennials) <br />Lighting <br />Drinking Fountain & Yard Hydrants <br />Parking Reconfiguration <br />Subtotal <br />Contingency, 10% <br />Estimated Year 2000 Construction Costs <br />Engineering and Administration, 15% <br />Estimated Year 2000 Project Costs <br />iiiii <br />III <br />iiii <br />$10, <br />$76, <br />$33,000 <br />$7,000 <br />$37,000 <br />$15, <br />$12, <br />$12,( <br />$202, <br />$20, <br />$222, <br />$33, <br />IIII <br />nil <br />IIII <br />III <br />IIII <br />IIIII <br />$255,1 <br />III <br />IIII <br />$10, <br />$73, <br />$12, <br />$4, <br />$6,000 <br />III <br />III <br />$11,000 <br />nil <br />nil <br />$116, <br />$12, <br />$128,000 <br />$19,000 <br />$147,000