Laserfiche WebLink
ORONO PLANNING COMMISSION MEETING <br />MINUTES FORmmmmimm <br />with the Intent tnet some day access would need to be provided for this property. This Issue <br />becomes a legal question over whether the driveway easement gives the Applicant the right to <br />construct a roadway to serve his development <br />Weinberger noted the City Engineer has reveiwed the drainage and grading plan for the <br />subdivision and is requesting some modifications. The City Engineer at this time has some <br />concerns regarding the size of the holding ponds and wants to insure that this development will <br />not increase the runoff to the surrounding area. The developer will need to submit the requested <br />Information for review and approval by City Staff. <br />Weinberger stated this proposed subdivision is located Immediately adjacent to Long Lake, with <br />the subdivision being serviced with sewer from an existing Long Lake sewer line. <br />The Applicant Is requested to submit the following information for review and approval prior to <br />a final plat application. <br />1. Detailed grading, drainage and erosion control plans shall be submitted for review es <br />requested by the City Engineer. <br />2. Final plans for sewer and water extension, including detailed sanitary sewer line profiles, <br />shall be approved by Staff prior to review. <br />3. The Metropolitan Council shall approve a MUSA expansion to the site. <br />4. A drainage area map, storm sewer and ponding calculations should be submitted for review <br />and approval by Staff. All ponds shall meet NURP standards. The ponds shown In the <br />development may not meet the minimum standards a NURP pond requires. <br />5. A permit from the Minnehaha Creek Watershed District is required for site land alteration <br />and wetland mitigation. <br />6. All easement documents for utilities, drainage and conservation land shall be approved by <br />the City Attorney. <br />7. Final plans for the construction of the roads shall be submitted for review. <br />8. The applicant provides final lot area (dry buildable acreage and wetland acreage) <br />Page 13