Laserfiche WebLink
Michael O'Donnel I, PE. <br />CONSULTING ENGINEER <br />April 11, 1984 <br />Painter's Creek Development Criporation <br />c/o Ron Bastyr and Associates, Inc. <br />15500 Wayzata Blvd. <br />Wayzata, MN 55391 <br />RE: Subsurface Exploration and Percolation Testinq at the Proposed <br />Painter's Creek Development Site in Orono, Minnesota <br />Gentlemen: <br />This report presents the results of supplementary test pits and percolation <br />tests conducted for the proposed Painter's Creek D-1velopment in Orono, <br />Minnesota. Since the reporting of the soil tests dated December 9, 1983, <br />the number of lots planned for -this site was reduced from twenty to ten. <br />Soil testing was requested by the site planner and the City of Orono in the <br />general area of lot 9, as well as additional testing in other areas. <br />The testing was conducted in a similar manner as that described in the soil <br />report dated December 9 The method of locating tests and test notation was <br />also the same as shown in the earlier report. Basically, two test pits and <br />four percolation tests were performed in a primary drain field area, and one <br />test pit and two percolation tests were performed in an alternate area. <br />19,14 701h Ak. nuc Noah 111.•ckcr. rZ:gIs <br />'.0%` <br />J <br />