Laserfiche WebLink
12) 4360 sayeide Rd. <br />All neighboring wells are located more than 100' away from the proposed <br />treatment area. <br />Keep all heavy equipment off of the proposed treatment area before and <br />after construction as much as possible. The treatment area should be <br />marked off before construction. <br />With proper installation and maintenance, this system should have no <br />problem in treating septic effluent effectively. <br />Recommend to pump the septic tank every year if there is only 1 tank <br />i every 2 years if there are 2 tanks. <br />Steven B. Schirmers Of <br />SBS/ds <br />