Laserfiche WebLink
Section B <br />Ventilation Method <br />(Choose either balanced or exhaust only) <br />Balanced, HRV (Heat Recovery Ventilator) or ERV (Energy Recovery❑ <br />Exhaust only <br />Ventilator) —cfm of unit in low must not exceed continuous <br />Continuous fan rating in cfm <br />ventilation ratingby more than 100%. <br />Low cfm:�� <br />High cfm: <br />QG <br />v V <br />Continuous fan rating in cfm (capacity must not exceed <br />continuous ventilation rating by more than 100%) <br />Directions - Choose the method of ventilation, balanced or exhaust only. Balanced ventilation systems are typically HRV or ERV's. <br />Enter the low and high cfm amounts. Low cfm airflow must be equal to or greater than the required continuous ventilation rate and <br />less than 100% greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the ventilation fan must not exceed 80 cfm.) <br />Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. <br />Section C <br />Ventilation Fan Schedule <br />Description Location Continuous Intermittent <br />Directions - The ventilation fan schedule should describe what the fan is for, the location, cfm, and whether it is used for continuous <br />or intermittent ventilation. The fan that is chose for continuous ventilation must be equal to or greater than the low cfm air rating <br />and less than 100% greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the continuous ventilation fan must not <br />exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. <br />Section D <br />Ventilation Controls <br />(Describe operation and control of the continuous and intermittent ventilation) <br />ERV has wall control set to 30%=93 CFM <br />ERV has wall control set to 60%=186 CFM <br />Directions - Describe the operation of the ventilation system. There should be adequate detail for plan reviewers and inspectors to verify design and <br />installation compliance. Related trades also need adequate detail for placement of controls and proper operation of the building ventilation. If exhaust fans <br />are used for building ventilation, describe the operation and location of any controls, indicators and legends. If an ERV or HRV is to be installed, describe how <br />it will be installed. If it will be connected and interfaced with the air handling equipment please describe such connections as detailed in the manufactures' <br />installation instructions. If the installation instructions require or recommend the equipment to be interlocked with the air handling equipment for proper <br />operation, such interconnection shall be made and described. <br />