My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M18-000003 - mechanical
Orono
>
Property Files
>
Street Address
>
W
>
Wood Duck Trail
>
2868 Wood Duck Trail - 33-118-23-24-0011
>
Permits/Inspections
>
M18-000003 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:24 PM
Creation date
2/22/2023 2:44:02 PM
Metadata
Fields
Template:
x Address Old
House Number
2868
Street Name
Wood Duck
Street Type
Trail
Address
2868 Wood Duck Trail
Document Type
Permits/Inspections
PIN
3311823240011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site address 7826 Peachvale I Date 12/07/2016 <br />Contractor Sabre Heating and A/C <br />Completed <br />Josh G. <br />Section A <br />Ventilation Quantity <br />(Determine quantity by using Table R403.5.2 or Equation 11-1) <br />Square feet (Conditioned area including <br />4434 <br />Total required ventilation <br />180 <br />Basement—finished or unfinished) <br />Total and Continuous Ventilation Rates <br />J G <br />90 <br />Continuous ventilation <br />Number of bedrooms <br />Number of Bedrooms <br />Directions - Determine the total and continuous ventilation rate by either using Table R403.5.2 or equation 11-1. <br />The table and equation are below <br />Table R403.5.2 <br />Total and Continuous Ventilation Rates <br />in cfm <br />Number of Bedrooms <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />Conditioned space (in <br />so. ft.1 <br />Total/ <br />continuous <br />Total/ <br />Total/ <br />continuous <br />Total/ <br />continuous <br />Total/ <br />Total/ <br />rnntiniir)iic. <br />1000-1500 <br />60/40 <br />75/40 <br />90/45 <br />105/53 <br />120/60 <br />135/68 <br />1501-2000 <br />70/40 <br />85/43 <br />100/50 <br />115/58 <br />130/65 <br />145/73 <br />2001-2500 <br />80/40 <br />95/48 <br />110/55 <br />125/63 <br />140/70 <br />155/78 <br />2501-3000 <br />90/45 <br />105/53 <br />120/60 <br />135/68 <br />150/75 <br />165/83 <br />3001-3500 <br />100/50 <br />115/58 <br />130/65 <br />145/73 <br />160/80 <br />175/88 <br />3501-4000 <br />110/55 <br />125/63 <br />140/70 <br />155/78 <br />170/85 <br />185/93 <br />4001-4500 <br />120/60 <br />135/68 <br />150/75 <br />165/83 <br />180/90195/98 <br />4501-5000 <br />130/65 <br />145/73 <br />160/80 <br />175/88 <br />190/95 <br />205/103 <br />5001-5500 <br />140/70 <br />155/78 <br />170/85 <br />185/93 <br />200/100 <br />215/108 <br />5501-6000 <br />150/75 <br />165/83 <br />180/90 <br />195/98 <br />210/105 <br />225/113 <br />Equation 11-1 <br />(0.02 x square feet of conditioned space) + [15 x (number of bedrooms + 1)] = Total ventilation rate (cfm) <br />Total ventilation —The mechanical ventilation system shall provide sufficient outdoor air to equal the total ventilation rate <br />average, for each one-hour period according to the above table or equation. For heat recovery ventilators (HRV) and energy <br />recovery ventilators (ERV) the average hourly ventilation capacity must be determined in consideration of any reduction of <br />exhaust or out outdoor air intake, or both, for defrost or other equipment cycling. <br />Continuous ventilation - A minimum of 50 percent of the total ventilation rate, but not less than 40 cfm, shall be provided, <br />on a continuous rate average for each one-hour period. The portion of the mechanical ventilation system intended to be <br />continuous may have automatic cycling controls providing the average flow rate for each hour is met. <br />
The URL can be used to link to this page
Your browser does not support the video tag.