My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-19-2001 Planning Packet
Orono
>
Planning Commission
>
2001
>
11-19-2001 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 2:32:40 PM
Creation date
2/22/2023 2:31:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />MONDAY, OCTOBER 15,2001 <br />(MM-2724 MICHELLE AND DAVID TIMP, CONTINUED) <br />Oberg staled the area where the boulder wall is to be constructed is pretty much virgin ground, with <br />no extra soil being brought in. <br />Hawn inquired whether landscape fabric would be used on *his project. <br />GafTron staled in order to construct the boulder wall properly, landscape fabric would need to be <br />used. Gaffron stated the boulder wall would be considered hardcover. <br />Mabusth recommended the Applicant compile some elevations for the area and the view from the <br />lake prior to this application proceeding to the City Council. <br />McElhatton reiterated his concerns relating to the global stability of the wall. <br />Lindquist stated the Planning Commission and City Engineer has recommended that issue be looked <br />at further. <br />Klulh inquired whether any additional fill would be needed. <br />Oberg stated in his view there probably is too much fill on the site, which will need to be hauled <br />away. <br />Lindquist moved, Kluth seconded, to recommend approval of Application #01*2724, Michelle <br />and David Timp, 1000 Wildhnrst Trail, granting of a conditional use permit to construct a <br />boulder retaining wall on the west and lake side of the residence and permit grading greater of <br />than 500 cubic yards of fill ,and a variance to the average lakeshore setback, subject to review <br />and approval by Staff of a landscape and drainage plan and in cooperation with the adjoining <br />property owners on the sight lines. <br />Hawn inquired whether a hardcover variance is needed for the 0-75' setback. <br />Gaffron stated the City does allow a staiivvay in the 0-7S' setback area. <br />Weinberger stated the only hardcover shown on the plan is the stairway. <br />VOTE: Ayes 6, Nays 0. <br />Hawn recommended the motion be amended to include global stability. <br />Hawn moved, Rahn seconded, to amend the motion to include the condition that the issues <br />relating to global stability be satisfied and approved by the City Engineer prior to this <br />application proceeding to the City Council, with the understanding the erosion controls and silt <br />fencing will be maintained until completion of the boulder wall and landscaping is established. <br />VOTE: Ayes 6, Nays 0. <br />PAGE 21
The URL can be used to link to this page
Your browser does not support the video tag.