Laserfiche WebLink
MINUTES OF THE ORONO PLANNING COMMISSION <br />Monday, September 17,2001 <br />6:30 o ’clock p.m. <br />(#0I*2715 John M. Bailey, Continued) <br />Stoddard moved. Smith seconded, to recommend approval of Application ttOI-2715, <br />John M. Bailey, 2807 Casco Point Road, granting of a variance to permit structural repairs and <br />addition of a foundation to an existing detached garage, and granting of a variance to hardcover <br />in the 75-250' setback to permit 40 square feet of additional sidewalk to connect the patio and <br />deck located to the west side of the house, subject to the garage meeting all applicable Fire and <br />Building Codes and a building permit being obtained for the replacement of the deck. <br />VOTE: Ayes 7, Nays 0. <br />(1113) #01-2714 FREDERICK PUZAK, 1340 BALDUR PARK ROAD, VARIANCES, <br />9:15 p.m.-9:45 p.m. <br />Fred Puzak. Applicant, was present. <br />The Certificate of Mailin)» and Affidavit of Publication were noted. <br />Weinberger stated the Applicant is requesting variances to permit new construction on the property. <br />The Applicant is proposing to tear down the existing residence and construct a new residence, fhe <br />property is located at the end of the Baldur Park Peninsula, with the majority of the lot being located <br />w ithin 75 feet of the lakeshore. <br />A variance to hardcover in the 0-75’ setback area is required to pennit 9.8 percent hardcover where <br />1 2.4 percent currently exists. A variance to hardcover is also required in the 75-250 ’ setback area to <br />allow 63.6 percent hardcover where 70.9 percent currently exists. A third variance is required to <br />permit the house to be located 48 feet from the lakeshore. within the 75 feet required setback. <br />Weinberger stated one of the main issues w ith this application is the septic. The property is located <br />within the MUS.A area, with the Applicant’s house being the only house on Baldur Park not connected <br />to sanitary sewer. The property is not served with sewer because the sewer service stops at the end of <br />the public maintained Baldur Park Road. Due to some issues not within the Applicant’s control, he <br />has been unable to connect to City sewer. In 1982, the Council had approved a preliminary plat <br />subdivision for two lots between the Applicant’s property and the end of the maintained Baldur Park <br />Road. The Applicant’s property is not connected to sewer because he does not have an easement for <br />utility or sewer purposes out to Baldur Park Road. <br />Weinberger stated the Applicant has an easement over Lot 31 for private septic purposes. There is one <br />system located on Lot 31 that is listed as compliant because it is more than three feet above the <br />seasonal water table. The system is not compliant with all regulations because the entire drainfield <br />site is located w ithin 75 feet of the lakeshore. In order for the City of Orono to permit construction of <br />a new home on this site, it must comply with one of the following; one, the new house must be <br />connected to sanitary sewer service, or two, the new house must be connected to a conforming septic <br />system meeting all the local and state standards. Since the existing system is located w ithin 75 feet of <br />the lakeshore, the new house cannot be connected to the existing system. The Applicant must provide <br />designs for two conforming septic systems on the individual lot on which the house is being <br />constructed. The Applicant w ill need to submit septic testing to show that there are two conforming <br />PAGE 20