My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-17-2001 Planning Packet
Orono
>
Planning Commission
>
2001
>
09-17-2001 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 2:32:31 PM
Creation date
2/22/2023 2:28:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Application Date: <br />Deadline: <br />8/17/01 <br />10/16/01 <br />TO:Chair Hawn and Orono Planning Commission Members <br />Ron Moorse. City Administrator <br />FROM:Paul Weinberger, Zoning Administrator/Planncr <br />DATE;September 11. 2001 <br />SUBJECT: #01-2715 John M. Bailey <br />2807 Casco Point Road <br />Variance - Public Hearing <br />Zoning District:LR-IC,'/: acre. One Family Lakeshorc Residential <br />Lbt of Exhibits <br />A <br />B <br />C <br />D <br />F <br />F <br />G <br />Application <br />Letter of Application <br />Site Sur\ey <br />Hardcover Calculation W'orksheets <br />Garage and Site Plans <br />Property Owners Notification List <br />Permit Record <br />Review of Request The property owners have requested a variance to permit structural repairs andj <br />addition of a foundation to an existing detached garage located l.I* from the property line. The <br />purpose of the new foundation is to raise the elevation of the garage to allow for the garage floor to <br />be at an elevation above the driveway. The property owners have stated the garage and driveway are <br />located in a low point and are a drainage backup area. Raising of the garage w ould not allow the <br />water to pool inside the garage. <br />Secondly the property owTiers arc requesting a hardcover variance to permit 40 s.f. of additional <br />sidewalk to connect the patio and deck located to the west side of the house. Two years ago the <br />property owners replaced the deck and patio and added the walkway. The concrete walk is <br />additional hardcover in the 75-250' setback over 25%. The total hardcover on the property, before <br />the sidewalk, is 5,704 s.f. (35%). Overall in the 75-250' setback total hardcover will be reduced to <br />4,304 s.f (27.4%). Most of the hardcover removals are attributed to the removal of approximately <br />1.500 s.f of landscaping plastic. <br />«0l-27i: John M Bailey <br />2S07CaKb Point Road <br />9/17/01 <br />Page I of3 <br />II <br />I
The URL can be used to link to this page
Your browser does not support the video tag.