Laserfiche WebLink
MINUTES OF THE ORONO PLANNING COMMISSION <br />Wednesday. January 17,2001 <br />(M2640/264I Orono Amber, Continued) <br />or the proposed new Coinprchcnsi\e Plan <br />Weinberger iiulicated the subjevi parcel was platted as Outlot F. The parcel being immediately to <br />the south of the Sugarwoods residential development It was intended at the time this property <br />was developed that it would need to be rcplattcd to a buildable lot status <br />The City of Orono has been looking for a development that would be compatible w ith the <br />sunoundiitg properties, the residential to the north and commercial uses to the south. <br />The Applicant is proposing to rezone the property from B-1 to B-6 and RPUD. The rezoning would be <br />a down-zoning of the property , w *:h the lot containing the senior iKXising building being rezoned to <br />the RPUD Distnet, and the property to the west being rezoned to B-6. which would allow general <br />office type uses <br />Weinberger stated the senior building is located w ith the majonty of the building towards the <br />southern portion of the lot The building is a three story building w hich w ill be platted as <br />separate condominiums and owned by a non-profit organization The portion of the building <br />located closest to the residential area will be a twx>-story structure The intent of the RPUD <br />Distnct u to provide bousing to meet lifecycle and afTordable and moderate cost housing needs <br />With this ty pe of housing, it may require the buildings to exceed the 30 feet maximum height <br />standard tlut applies to single family residential homes and office buildings <br />Weinberger stated the proposed office building would consist of two stories with approxinuicly <br />23,000 square feet of gross floor space Also being proposed under the building is a 21 stall <br />underground parking area The building is designed to step down from a two-story stmeture to <br />one story immediately adjacent to the Sugarwoods neighborhood <br />Weinberger indicated the general concept approval that is being requested this evening is <br />required as part of the Highway 12 PUD and the rezoning General concept approval is similar <br />to prelitr'nary plat approval The City will not approve the preliminary plat until sometime later in the <br />application process because the developer of this particular development is seeking financial <br />assistance from the City, with the TIF revenues being utilized to help offset some of the costs <br />of development, landscaping, roadways, trails, and to help keep the costs affordable <br />Weinberger staled the pnnury change between this plan and the original plan consists of a trail <br />connection that would be made through the property eventually connecting out .j the east side <br />The trail connection is important because of the type of use within the building Weinberger noted <br />a City trail also exists in this area located north and south along Brown Road, with the proposed <br />trail ultimately connecting to the regional trail system <br />Weinberger stated Lot I consists ?f 2 7 acres, which is designated for the office building, and <br />Lot 2 consists of 4 acres designated for the senior housing facility. <br />Weinberger stated if the Planning Commission should recommend approval of the general <br />concept. Staff wtnild prr;i;c a resolution defining all the necessary requirements that wtnild need <br />to be met by the developer prior to final approval <br />PAGE 17