My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-21-2002 Planning Packet
Orono
>
Planning Commission
>
2002
>
10-21-2002 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 12:15:12 PM
Creation date
2/22/2023 12:10:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Oot 17 2Q02 8:18RM BOME8TROO ROSENE RNDERLIK 6516361311 P*2 <br />Additional storm sewer may be necessary on the easterly parcel to convey storm water flows. <br />Final plans should show plan and profile views of the proposed sewer and include storm sewer <br />details. .A drainage area map and storm sewer calculations should be submitted for our review. <br />Silt fence and any other erosion control measures should be in place prior to any site grading. <br />Final plans should be submitted to the Minnehaha Creek Watershed District (MCWD) for their <br />review. <br />4. Streets^Trails/Parking: A geotechnical report, R-value recommendation and pavement design <br />should be provided for review. A typical street section for repairs to Old Crystal Bay Road <br />should be included in the plan set Details should be provided for the proposed bituminous trail <br />along TH 12. MN/DOT should review and comment on the location and design of the trail. <br />5. Flnracial Guarantee: We have estimated the cost of site improvements to be $196,936, the <br />itemized estimate is att^hed. The applicant should provide a financial guarantee of 150% of this <br />amount or $295,404 prior to any work on the site. The financial guarantee can be reviewed and <br />reduced periodically as work is completed and accepted. The financial guarantee should never be <br />less than $20,000 until the job is complete and all work has been accepted by the City. <br />Please contact me at (651) 604-4863 if 3tou have any questions regarding this matter. <br />Yours very druly, <br />BONESTROO, ROSENE, ANDERUK & ASSOCIATES, INC. <br />Tom Kellogg <br />Attachment <br />Cc: Greg Gappa, City of Orono
The URL can be used to link to this page
Your browser does not support the video tag.