Laserfiche WebLink
OCT-08-2002 155 53 MINNEHftHfl CREEK URTERSHED 612471'J682 P.01/02 <br />Minnebaha Creek i I Watershed District <br />GrayFrishwsurCcnltf - <br />Hwyt1sai9,Navan« <br />Mall: <br />ZSOOShadywoodRoad <br />Excelsior, MN 5S331-9S78 <br />Phone: (952) 471-O5Q0 <br />Fk (952)471-0682 <br />Erndh <br />•dminQniinnehitacruk.QrB <br />WsbSIte; <br />wwwjtiinnehahflcreek.of9 <br />Board of Hanegtra <br />Pamela Q.BIxt <br />JwnasCaOdns <br />Lance FWiar <br />Monica Gross <br />Scott Thomas <br />Richard MIer <br />Robert Schroeder <br />T <br />Improving Quality cfWater, QualiyofUfi <br />^ec^d /ols/o9^ <br />October 8,2002 <br />Wendy Bottenberg <br />City of Orono <br />P.O. Box 66 <br />Long Lake, MN 55356 <br />Boyer Building Corporation <br />18279 Minnetonka Boulrv* n <br />Wayzaia, MN 55391 <br />RE: Two-lot subdivision at 3320 Watertown Road, Qty of Orono <br />Dear Applicant: <br />This lener is to inform the property owner and City of Greenwood chat after <br />reviewing a brief project description for the location cited above, it appears that the <br />project will require permits from the Minnehaha Creek Watershed District Once tire <br />project design is finalized, MCWD encourages you to submit an application as soon <br />as possible. Projects of this nature will require approval of the MCWD Board of <br />Managers which typically ranges between 30-45 days. Delays in subminals will <br />ultimately result in project delays. <br />Please consult MCWD Rules for guidance on the required exhibits to be submitted <br />with an application. In addition to the items included In the District Rules, the <br />following bulleted items must be submitted as a part of specific project <br />application: <br />• Rule A; frocedural Requirements <br />1. Submit address labels obtained from Hennepin County which cite the <br />name.<; and addresses of all of the property owners who reside within 600 feet <br />of the project areu <br />2. Notification of approval or preliminary approval from the City Council or <br />Planning Comiiussian <br />• Rule B; Erosion Control <br />1. Flan must state with detail vegetation and stabilization will occur within <br />48 hours of completed grading <br />2. An erosion control plan must be submitted with this application. This <br />includes indication of silt fence and all other necessary erosion control <br />measures, which must be placed on all downhill slopes in areas where <br />grading will ocenr. <br />• Rule D: Wetland Protection <br />1. A wetland determination must be performed on this site