My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-17-2002 Planning Packet
Orono
>
Planning Commission
>
2002
>
06-17-2002 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 4:02:14 PM
Creation date
2/16/2023 3:59:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PUD Rezonlog & lllghway 12 Corridor Stondardi <br />Applicant is requesting to rc/one this vacant property to B-6 Highway Commercial District. The <br />2000*2020 Orono Community Management Plan guides this property for Commercial Office uses, <br />hence the proposal is in conformity with the Comprehensive Plan. Professional olfices ore a <br />permitted use in the B*6 District, and rezoning to B*6 is allowed under the “Special Requirements <br />for Rezoning in the Highway 12 Corridor Study Area” of zoning corlc Section 10.52, Subd. 5, hence <br />B-6 is the appropriate zoning for the proposed use. Section 10.52 additionally contains a number <br />of development standards applicable to this site: <br />(Subd. I) - Minimum Area. Minimum area for a rezoning in the Highway 12 Corridor is 5 acres <br />(variasce required - the existing parcel is nominally 2.0 acres in area; the site was created in 1984 <br />to accommodate a branch of the Hennepin County Library, w hich was never built. The City of Orono <br />purchased the site in 1996 for temporary public w orks use and as a means of controlling the future <br />development of the site. Given the fact that the site exists as a separate parcel and the proposed use <br />conforms to the CMP and the B*6 district, an area variance to allow rezoning of the site may be <br />treasonable. The adjacent existing vacant lot directly cast is 2.5 acres, and will likely involve a <br />similar request in the near future. <br />(Subd. 2) - Access and circulation plan . The proposed site plan meets the general standards <br />developed for the Highway 12 corridor, in that all access is directly to Kelley Parkw ay. and trail links <br />arc provided. An easement will be required for the existing trail on the properly paralleling Old <br />CrystakI Bay Road. Sidewalks trails w ithin the Kelley Parkway and Highway 12 nghts-of-way arc <br />^ubjcct to approval by Orono and MnDOT respectively. <br />(Subd. 3) - Sanitary Sewer and Municipal Water must be available. They arc. City w ill dctemiinc <br />whether any assessments or connection charges arc due. <br />(Subd. 4) - Stormwater Management . The code requires that a stormwater management plan be <br />submitted and be in compliance w ith City standards. See discussion below and City Engineer ’s <br />comments. <br />(Subd. 5) - Allow able districts for rezoning include B-6. This section also requires that any rezoning <br />involving a modification to zoning requirements must be processed as a PUD - the minimum area <br />variance therefore forces this to be a PUD rezoning. <br />(Subd. 6) - Building Design and Construction - addresses the exterior wall finishes, architectural <br />compatibility of future additons and outbuildings, and prohibits temporary buildings. The proposal <br />appears to be in compliance with the pertinent standards. <br />(Subd. 7) - Require* that all re/onings w ithin the Highw ay 12 Corridor are subject to a Dcvelonment <br />Agreement assuring compliance w ith the requirements of Section 10.52. <br />L <br />*02-2712 ProfnUoiMl Prop«nic« of Orono <br />Ma> 17.2002 <br />Pitc2or7
The URL can be used to link to this page
Your browser does not support the video tag.