My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-2002 Planning Packet
Orono
>
Planning Commission
>
2002
>
01-22-2002 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 3:32:38 PM
Creation date
2/16/2023 3:30:36 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Management Practices. The church is advised to contact the MCWT). A grading plan should be <br />required prior to final Council action on this application. <br />CUP for Church Use: <br />As noted above, the church apparently has never been formally issued a CUP for the church use <br />of the site. The existing and proposed use of the site complies with all the standards applicable <br />to a church use. A formal CUP for the church should be issued along with the approval for the <br />addition. The resolution for the addition will contain language formalizing the church use CUP. <br />Standard CUP Requirements: <br />A conditional use permit shall remain in effect as long as the conditions agreed upon are <br />observed, and the use does not cease for a periou of more than 6 months. CL^Ps may be <br />revokable, may be granted for a limited time, or may be granted subject to conditions as the <br />Council may prescribe. <br />Fire Suppression: <br />The church has been advised that the entire existing and new building have to be pro\ ided with <br />fire suppression sprinkling as a result of the additions. <br />Staff Recommendation: <br />Staff recommends approval of the conditional use permit w ith the follow ing conditions: <br />1. Resolution shall contain lar guage formalizing the church use of the property. <br />2. Additions approved per submitted site plan subject to: <br />a. Kitchen not being installed until/unless the septic system is upgraded to accommodate <br />that additional use. or the building is connected to sanitarv sewer. <br />b. Grading plan including any stormwater management systems required by MCWD <br />must be submitted prior to final Council action. <br />3. Any change or more intense use of the property w ill require an amendment to the conditional <br />use permit. <br />4. A conditional use permit shall remain in effect as long as the conditions agreed upon are <br />observed, and the use does not cease for a period of more than 6 months. If the use of the <br />property as a church would cease for a period of 6 months a new conditional use permit is <br />required. <br />tt02-274l Calvin Pres Church (Vannum Co ) <br />Glendale Drive <br />CUP <br />I N 2002 <br />Page 4
The URL can be used to link to this page
Your browser does not support the video tag.