My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-2002 Planning Packet
Orono
>
Planning Commission
>
2002
>
01-22-2002 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 3:32:38 PM
Creation date
2/16/2023 3:30:36 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Lighting; <br />A lighting plan has not been completed for the project. City Ordinance requires that light sources <br />not be visible at property lines. 1 he church has discussed the possibility of adding a light pole by <br />the new access behind the church. Existing lighting is located on either side of the parking lot. <br />One light is on the top of the telephone pole, another on a light pole and two smaller lights on the <br />front of the church by the front doors. If additional lighting is requc.'ted, the church would need <br />to submit a plan for review prior to issuance of a permit. <br />Landscaping Plan: <br />The property is landscaped and the church plans no substantial modification of the existing <br />landscape. <br />Septic: <br />The property contains a private sewage treatment system. Routine inspections have determined <br />the septic system on the property is non-compliant and must be replaced by 2010. fhe current <br />septic code does not prohibit use of the property due to non-compliant systems. I low ever. if it <br />should be detennined the system is failing the system would reuuire immediate replacement or <br />could potentially hook up to sewer since the property was Just included in the MUSA. <br />The septic inspector has reviewed the propo.sed use of the property and has determined the <br />existing sentic system would need to be upgr.idcd hcforc cxMistruction of the kitchen could begin. <br />At that time, if the church w ishes to convert to sewer, sewer ser\ ice could potentially be <br />provided by City of Long Lake. Orono currently does not have laterals w hich could ser\ e this <br />property directly, although a .stub apparently intended to service this side as part of the 1973 <br />Hackberry sewer project exists near the southwest corner of the site but does not abut the site, the <br />church was not assessed for sewer. Future development in this area, which was recently reguided <br />for 2-3 units/acre, could result in new sewer lateral which might serve the church. <br />Signage Allowance:1 s.f per foot of lot w idth, not over 50 s.f <br />W'ith a 10' required setback. <br />A signage plan was not submitted w ith the application. If a change is requested, the church <br />would need to submit a plan for review prior to issuance of a permit. <br />Grading/Drainage: <br />A grading plan has not been designed, but minimal change to the existing grade is expected. This <br />is an existing site and building. Under Minnehaha Creek Watershed District (MCWD) Rule N, <br />the church potentially w ill be required to do runoff rate control ponding us well as adhere to Best <br />U02-274I Calvin Pres. Church (Vanman Co.) <br />177 Glendale Drive <br />CUP <br />1/I4.'200J <br />Page 3
The URL can be used to link to this page
Your browser does not support the video tag.